Building Permits in EnerGovProd, Florida

Access 18,470 building permits issued in EnerGovProd, Florida through a single REST API. Refreshed daily from the official EnerGovProd open data portal and normalized into a consistent schema.

18,470
Total permits
5,257
Last 12 months
488
Last 30 days
-40%
vs same period prior year
Jun 6, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Electrical
944
Interior remodel
485
Roofing
476
Plumbing
434
New construction
313
Addition
236
HVAC
206
Renovation
93
Mechanical
69
Demolition
49

Most recent permits

The 10 most recent permits issued in EnerGovProd, Florida. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-06-052026-0049-SEPTICR25455 JulyOtherreplacing cracked 1000 gal lift tank
2026-06-052026-0039-SEPTICR40494 SunriseRenovationNew 1500-gallon 2-compartment septic tank
2026-06-052026-0460-BLDR26875 SierraAdditionBasement finishing including: framing, drywall, outlets and lights, vents, finishes
2026-06-052026-0416-BLDR24362 PrimroseOther1- 20'x24'x10' Pole Building
2026-06-052026-0324-BLDR6876 443rdNew constructionSingle-Family Slab-on-Grade
2026-06-052026-0315-BLDR11575 InterlachenHVACFull interior renovation of existing single-family lake home including lower and m...
2026-06-052026-0048-BLDC43817 ForestInterior remodelTear off and Re-side Shop and Detached Garage
2026-06-052026-0158-MECR345 4thPlumbingSewer line replacement
2026-06-042026-0343-BLDR35143 Grand AveNew constructionnew home
2026-06-042026-0433-BLDR30160 OlindaInterior remodelUnit #305

Access EnerGovProd permit data via API

Query EnerGovProd, Florida permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search all EnerGovProd permits issued this month
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=EnerGovProd&state=FL&issued_after=2026-04-01"

Other cities we cover

Related coverage in Florida and nationwide.

FAQ

Where does PermitStack get EnerGovProd permit data?

We ingest data directly from the official EnerGovProd open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.

How current is the EnerGovProd data?

Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for EnerGovProd, Florida was issued on June 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.

Can I access EnerGovProd permits without an API key?

Yes — our free tier includes 100 requests per day, enough to search and filter EnerGovProd permits interactively. Sign up for a free API key to get started.

Can I export EnerGovProd permit data?

Yes. Paid plans support CSV export and periodic webhooks for changed permits.

How long does an EnerGovProd building permit take to issue?

The median time from permit filing to issuance in EnerGovProd, Florida is 4 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get EnerGovProd permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key