Access 18,470 building permits issued in EnerGovProd, Florida through a single REST API. Refreshed daily from the official EnerGovProd open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
The 10 most recent permits issued in EnerGovProd, Florida. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-05 | 2026-0049-SEPTICR | 25455 July | Other | replacing cracked 1000 gal lift tank |
| 2026-06-05 | 2026-0039-SEPTICR | 40494 Sunrise | Renovation | New 1500-gallon 2-compartment septic tank |
| 2026-06-05 | 2026-0460-BLDR | 26875 Sierra | Addition | Basement finishing including: framing, drywall, outlets and lights, vents, finishes |
| 2026-06-05 | 2026-0416-BLDR | 24362 Primrose | Other | 1- 20'x24'x10' Pole Building |
| 2026-06-05 | 2026-0324-BLDR | 6876 443rd | New construction | Single-Family Slab-on-Grade |
| 2026-06-05 | 2026-0315-BLDR | 11575 Interlachen | HVAC | Full interior renovation of existing single-family lake home including lower and m... |
| 2026-06-05 | 2026-0048-BLDC | 43817 Forest | Interior remodel | Tear off and Re-side Shop and Detached Garage |
| 2026-06-05 | 2026-0158-MECR | 345 4th | Plumbing | Sewer line replacement |
| 2026-06-04 | 2026-0343-BLDR | 35143 Grand Ave | New construction | new home |
| 2026-06-04 | 2026-0433-BLDR | 30160 Olinda | Interior remodel | Unit #305 |
Query EnerGovProd, Florida permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all EnerGovProd permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=EnerGovProd&state=FL&issued_after=2026-04-01"
Related coverage in Florida and nationwide.
We ingest data directly from the official EnerGovProd open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for EnerGovProd, Florida was issued on June 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter EnerGovProd permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in EnerGovProd, Florida is 4 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key