Access 16,711 building permits issued in Lagunahills, California through a single REST API. Refreshed daily from the official Lagunahills open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Lagunahills.
The 10 most recent permits issued in Lagunahills, California. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-18 | BLDC-0034-2026 | 24155 LAGUNA HILLS | Electrical | THIS PROJECT IS FOR THE CONSTRUCTION OF TWO GROUND-UP SHELL BUILDINGS. |
| 2026-06-18 | MECC-0006-2026 | 22912 EL PACIFICO | HVAC | Upgraded root top units |
| 2026-06-18 | BLDC-0033-2026 | 24126 LAGUNA HILLS | Demolition | Demolition plan for Firestone BLDG 1800 SQFT |
| 2026-06-18 | BLDR-0184-2026 | 24851 GRISSOM | Solar | PICTURE FRAME SOLAR SECTION ONLY. REMOVE AND PROPERLY STORE EXISTING TILE. REMOVE ... |
| 2026-06-18 | ELER-0163-2026 | 27472 HIDDEN TRAIL | Other | Energy storage system installation |
| 2026-06-17 | BLDR-0183-2026 | 26081 EL PRADO | Roofing | Tear off and reuse existing pioneer eagle tiles with underlayment |
| 2026-06-17 | ELEC-0008-2026 | 24422 AVENIDA DE LA CARLOTA | Other | Modification to an existing unmanned wireless telecommunication facility at 24422 ... |
| 2026-06-17 | MECR-0056-2026 | 24772 LARGO | HVAC | 5 TON HEAT PUMP SPLIT SYSTEM CHANGE OUT. |
| 2026-06-17 | BLDC-0032-2026 | 22912 EL PACIFICO | Roofing | Tear off tile roof and re-roof with GAF shingles |
| 2026-06-17 | BLDR-0181-2026 | 25931 CEDARBLUFF | Roofing | Lift and relay tile roof section only |
Query Lagunahills, California permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Lagunahills permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Lagunahills&state=CA&issued_after=2026-04-01"
Related coverage in California and nationwide.
We ingest data directly from the official Lagunahills open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Lagunahills, California was issued on June 18, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Lagunahills permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Lagunahills, California is 5 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key