Platform
Search Coverage Property History Alerts
Solutions
Solar & Energy Solar Permit Data Roofing HVAC Real Estate Insurance Contractors
Company
Pricing API Docs Blog Sign In Get API Key
Massachusetts

Building Permits in Cambridge (Additions), Massachusetts

Access 14,041 building permits issued in Cambridge (Additions), Massachusetts through a single REST API. Refreshed daily from the official Cambridge (Additions) open data portal and normalized into a consistent schema.

14,041
Total permits
1,632
Last 12 months
78
Last 30 days
-47%
vs same period prior year
Jun 18, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Addition
1,202
Demolition
121
Roofing
117
Electrical
82
HVAC
62
Plumbing
36
New construction
9
Solar
3

Top contractors in Cambridge (Additions)

Most active contractors by permit volume in Cambridge (Additions).

Most recent permits

The 10 most recent permits issued in Cambridge (Additions), Massachusetts. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-06-181213997987 Massachusetts Ave, Cambridge, MA 02138DemolitionDemolish exisiting property wall between property and sidewalk 8' Long x 8&quo...
2026-06-18121683032 COPLEY ST, Unit 2, Cambridge, MA 02138ElectricalInterior remodel of existing 3rd floor primary bathroom, including selective demol...
2026-06-18121648925 KELLY RD, Unit 1, Cambridge, MA 02139Additionweatherization installation for units 1,2,3
2026-06-1712149672130 MASSACHUSETTS AVE, Unit 6D, Cambridge, MA 021AdditionExisting kitchen remodeling to include: 1. Remove existing cabinets, sink and fauc...
2026-06-17121629513 Ellery Sq, Cambridge, MA 02138Addition4 Windows replaced on the front of the home
2026-06-171216020670 Huron Ave, Cambridge, MA 02138AdditionRemove and repair ~37 SQ FT of crumbling concrete at garage entrance.  Install #5 ...
2026-06-17121181764 Linnaean St, Cambridge, MA 02138PlumbingDemolition of interior finishes to facilitate replacement of various plumbing pipe...
2026-06-16121386953 Bow St, Cambridge, MA 02138AdditionReconstruct four newly renovated dorm suites, consisitng of fthree to four bedroom...
2026-06-161214308158 MT AUBURN ST, Unit 158/1, Cambridge, MA 02138Additionrelocate galley kitchen to first floorInstall cabinets and appliancesReplace showe...
2026-06-16121220775 Ames St, Cambridge, MA 02142AdditionThis project consists of a renovation of existing laboratories on the 9th floor. W...

Access Cambridge (Additions) permit data via API

Query Cambridge (Additions), Massachusetts permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search all Cambridge (Additions) permits issued this month
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Cambridge%20(Additions)&state=MA&issued_after=2026-04-01"

Other cities we cover

Related coverage in Massachusetts and nationwide.

FAQ

Where does PermitStack get Cambridge (Additions) permit data?

We ingest data directly from the official Cambridge (Additions) open data portal (Tyler Data & Insights (Socrata)) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.

How current is the Cambridge (Additions) data?

Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Cambridge (Additions), Massachusetts was issued on June 18, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.

Can I access Cambridge (Additions) permits without an API key?

Yes — our free tier includes 100 requests per day, enough to search and filter Cambridge (Additions) permits interactively. Sign up for a free API key to get started.

Can I export Cambridge (Additions) permit data?

Yes. Paid plans support CSV export and periodic webhooks for changed permits.

How long does a Cambridge (Additions) building permit take to issue?

The median time from permit filing to issuance in Cambridge (Additions), Massachusetts is 18 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Cambridge (Additions) permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key