Access 12,660 building permits issued in Rockland County, New York through a single REST API. Refreshed daily from the official Rockland County open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
The 10 most recent permits issued in Rockland County, New York. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-17 | RWU-26-18837 | — | Other | Emergency Corrosion |
| 2026-06-17 | DOH-MDRR-26-0005 | 27 Bridge | Other | 3 Unit Building at 27 Bridge Street |
| 2026-06-16 | RWU-26-18835 | — | Other | Install new gas service |
| 2026-06-16 | RWU-26-18836 | — | Renovation | Gas Valve Repair |
| 2026-06-15 | RWU-26-18834 | — | Other | Install underground conduit. Size of Opening is 3 ft. x 50 ft. |
| 2026-06-15 | RCSDWQ-26-0045 | 73 Forshay | Other | Parking lot expansion |
| 2026-06-12 | RWNU-26-4992 | 58 College | Plumbing | Driveway Construction, tying into drainage structures, water and sewer connections. |
| 2026-06-09 | RWU-26-18833 | — | Other | Gas Main Replacement |
| 2026-06-09 | RWU-26-18832 | 69 Mc Namara | Renovation | EMERGENCY PERMIT REQUEST |
| 2026-06-03 | RWU-26-18831 | 1 Great Oaks | Other | PERMIT REQUEST |
Query Rockland County, New York permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Rockland County permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Rockland%20County&state=NY&issued_after=2026-04-01"
Related coverage in New York and nationwide.
We ingest data directly from the official Rockland County open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Rockland County, New York was issued on June 17, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Rockland County permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Rockland County, New York is 3 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key