Building Permits in Seattle Electrical, Washington

PermitStack indexes 491,340 building permits issued in Seattle Electrical, Washington, with 25,616 issued in the last 12 months alone. Search by address, contractor, category, and date via our free REST API.

491,340
Total permits
25,616
Last 12 months
1,961
Last 30 days
-12%
vs same period prior year
Apr 30, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Electrical
21,430
HVAC
3,305
Solar
694
Roofing
102
EV charger
85

Most recent permits

The 10 most recent permits issued in Seattle Electrical, Washington. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-04-307140837-EL305 HARRISON STElectricalInstall 150a Panel 120/208v 3 Phase 4 wire and 16 dimming modules. Install Invert...
2026-04-307140840-EL715 ALDER STElectrical905230 - CT - NWKC ALTERED CKTS FOR BUCK BOOST TRANSFORMERS
2026-04-307140809-EL4400 BEACH DR SWElectricalPanel change
2026-04-307140834-EL534 NE NORTHGATE WAYElectricalInstallation of (2) new T-stats for (2) new RTU's.
2026-04-307140838-EL10620 RIVIERA PL NEElectricalInstalling new security system. Glass breaks and motion sensor. Contacts. Keypad. ...
2026-04-307140839-EL2014 NE 104TH STElectricalInstall one 20amp circuit for bidet
2026-04-307140807-EL4625 S FINDLAY STElectricalI am building a new home
2026-04-307140808-EL5604 47TH AVE SElectricalA new building
2026-04-307140810-EL7917 11TH AVE SWHVACRun 1 circuit to Install Durastar single-zone heat pump system with wall-mounted i...
2026-04-307140845-EL2121 7TH AVEElectricalRelocate security door package SEA41 FL 23.400 to 23.200

Access Seattle Electrical permit data via API

Query Seattle Electrical, Washington permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search all Seattle Electrical permits issued this month
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Seattle%20Electrical&state=WA&issued_after=2026-04-01"

Other cities we cover

Related coverage in Washington and nationwide.

FAQ

Where does PermitStack get Seattle Electrical permit data?

We ingest data directly from the official Seattle Electrical open data portal (Tyler Data & Insights (Socrata)) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.

How current is the Seattle Electrical data?

Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Seattle Electrical, Washington was issued on April 30, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.

Can I access Seattle Electrical permits without an API key?

Yes — our free tier includes 1,000 requests per day, enough to search and filter Seattle Electrical permits interactively. Sign up for a free API key to get started.

Can I export Seattle Electrical permit data?

Yes. Paid plans support CSV export and periodic webhooks for changed permits.

How long does a Seattle Electrical building permit take to issue?

The median time from permit filing to issuance in Seattle Electrical, Washington is 13 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Seattle Electrical permit data in your app today

Free tier covers 1,000 requests per day. No credit card required.

Get Free API Key