Skip to content
Products API & Data Search Coverage Property History Alerts For Contractors Data Exports
Solutions Solar & Energy Roofing HVAC Real Estate Insurance Lenders & CRE Contractors
Pricing Refer & Earn API Docs Sign In Get Started
Arizona

Bisbee, Arizona Building Permit Search

Access 891 building permits issued in Bisbee, Arizona through a single REST API, normalized into a consistent schema. Data through October 2, 2026.

891
Total permits
553
Last 12 months
31
Last 30 days
-24%
vs same period prior year
Oct 2, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Roofing
94
HVAC
88
Plumbing
76
Electrical
62
Interior remodel
57
New construction
43
Renovation
30
Fence
28
Addition
17
Demolition
13

Property history for Bisbee

Every permit we hold for one Bisbee address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent permits issued in Bisbee, Arizona. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-10-02BP-2026-0521106 TURQUOISE STHVACHVAC Remodel Furnace 106 TURQUOISE ST-HVAC-TONY CARBAJAL
2026-10-02ROW-2026-051329 SPRING CANYONNew constructionRight of Way Use/Excavation New Residential ROW-29 Spring Cyn- Service Abandonment
2026-09-30BP-2026-0500139 HIGGINS HILLNew constructionAccessory structures New Deck 139 Higgins Hills-New Deck
2026-09-29BP-2026-0505804C TOMBSTONE CYNRoofingResidential building Re-roof Single-family dwelling 804 C TOMBSTONE CYN-ROOF REPAIR
2026-09-29BP-2026-0516815 PITTSBURGH AVERoofingResidential building Tear-off and re-roof Single-family dwelling 815 PITTSBURGH AV...
2026-09-29BP-2026-0519400 POWELL STElectricalAccessory structures Repair Shed 400 POWELL ST-ELECTRICAL
2026-09-29BP-2026-0508400 POWELL STInterior remodelResidential building Remodel Recreational dwelling 400 POWELL ST-DRYWALL-WOODWK-PNT
2026-09-28BP-2026-051527 HIGH RDNew constructionAccessory structures New Shed 27 HIGH ROAD-SHED
2026-09-25ROW-2026-0512106 STAR AVENew constructionRight of Way Use/Excavation New Residential ROW-106 Star Ave-Abandonment
2026-09-25BP-2026-0514106 TURQUOISE STRoofingResidential building Re-roof Single-family dwelling 106 TURQUOISE ST-ROOF-Tony Car...

Access Bisbee permit data via API

Query Bisbee, Arizona permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search Bisbee permits issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Bisbee&state=AZ&issued_after=2026-09-06"

Sources for Bisbee

The official record sets behind this page, with the date each one's data runs through.

Record setSourcePermitsData throughNote
PermitsCloudpermit8912026-10-02

Other cities we cover

Related coverage in Arizona and nationwide.

FAQ

Where does PermitStack get Bisbee permit data?

We ingest Bisbee's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Bisbee data?

The newest permit we hold for Bisbee, Arizona is dated October 2, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.

Can I access Bisbee permits without an API key?

Yes — search Bisbee permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).

Can I export Bisbee permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.

How long does a Bisbee building permit take to issue?

The median time from permit filing to issuance in Bisbee, Arizona is 3 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Bisbee permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key