Building Permits in Tempe, Arizona

Access 19,326 building permits issued in Tempe, Arizona through a single REST API. Refreshed daily from the official Tempe open data portal and normalized into a consistent schema.

19,326
Total permits
2,897
Last 12 months
304
Last 30 days
+16%
vs same period prior year
May 5, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Plumbing
432
Electrical
344
Renovation
333
Solar
186
Addition
165
Interior remodel
109
Pool
64
New construction
43
Roofing
35
Foundation
17

Most recent permits

The 10 most recent permits issued in Tempe, Arizona. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-05-05BP26077362 W SECRETARIAT DRAdditionLIVABLE ADDITION
2026-05-05BP2605581320 E UNIVERSITY DROtherEXPANSION OF EXISTING LOADING DOCK
2026-05-05BP2606631 W ELLIOT RDOtherTI --SUITE 109 (REQUEST C of O -- NO CONSTRUCTION)
2026-05-05BP2604869875 S PRIEST DROtherTI- SUITE 102
2026-05-05BP2605571320 E UNIVERSITY DROtherNEW ONE-STORY OPEN STRUCTURE PRE-ENGINEERED CANOPIES FOR SHADING EQUIPMENT AND STO...
2026-05-05SFR260141017 E EL FREDA RDAdditionG & D FOR SFR ADDITION
2026-05-05BP260600946 S MILL AVEElectricalProposed new patio + remodel to include modify existing restroom to make ADA compl...
2026-05-05BP2606361461 E APACHE BLVDPoolDEMOLITION OF TWO (2) STRUCTURES & INGROUND POOL
2026-05-05BP250976715 W 5TH STOtherLIGHTING IMPROVEMENTS - STRUCTURAL REVIEW
2026-05-05BP2609052167 E BALBOA DRSolarINSTALL PV SYSTEM & BATTERY

Access Tempe permit data via API

Query Tempe, Arizona permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search all Tempe permits issued this month
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Tempe&state=AZ&issued_after=2026-04-01"

Other cities we cover

Related coverage in Arizona and nationwide.

FAQ

Where does PermitStack get Tempe permit data?

We ingest data directly from the official Tempe open data portal (ArcGIS Hub) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.

How current is the Tempe data?

Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Tempe, Arizona was issued on May 5, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.

Can I access Tempe permits without an API key?

Yes — our free tier includes 1,000 requests per day, enough to search and filter Tempe permits interactively. Sign up for a free API key to get started.

Can I export Tempe permit data?

Yes. Paid plans support CSV export and periodic webhooks for changed permits.

How long does a Tempe building permit take to issue?

The median time from permit filing to issuance in Tempe, Arizona is 20 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Tempe permit data in your app today

Free tier covers 1,000 requests per day. No credit card required.

Get Free API Key