Skip to content
Products API & Data Search Coverage Property History Alerts For Contractors Data Exports
Solutions Solar & Energy Roofing HVAC Real Estate Insurance Lenders & CRE Contractors
Pricing Refer & Earn API Docs Sign In Get Started
California

Baldwin Park, California Building Permit Search

Access 10,408 building permits issued in Baldwin Park, California through a single REST API, normalized into a consistent schema. Data through September 30, 2026.

10,408
Total permits
2,051
Last 12 months
45
Last 30 days
—
vs same period prior year
Sep 30, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Electrical
515
Interior remodel
304
Plumbing
278
Roofing
233
Mechanical
225
New construction
180
Addition
30
Demolition
17
HVAC
14
Solar
12

Permit data by trade in Baldwin Park

Drill into the most common permit categories in Baldwin Park.

Top contractors in Baldwin Park

The most active contractors by permit volume in Baldwin Park, with a profile of each one's permit history. Counts are permits we hold for Baldwin Park.

Property history for Baldwin Park

Every permit we hold for one Baldwin Park address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent permits issued in Baldwin Park, California. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-09-30BLDG-0926-84964718 LA RICA AVEElectricalELECTRICAL FOR EXTERIOR OUTLETS BY FRONT GATE FOR CAMARAS
2026-09-29BLDG-0926-84944727 BALDWIN PARK BLVDRoofingRE-ROOF DWELLING, REMOVE AND REPLACE WITH OWENS CORNING COOL ROOF SHINGLES
2026-09-29BLDG-0826-823914634 VIA EL CAMINOSolarSOLAR: ADDITION TO EXISTING PV SYSTEM — INSTALL RESIDENTIAL ROOF-MOUNTED PV SOLAR ...
2026-09-29BLDG-0926-84934725 BALDWIN PARK BLVDRoofingRE-ROOF DWELLING, REMOVE AND REPLACE WITH OWENS CORNING COOL ROOF SHINGLES
2026-09-29BLDG-0926-84871629 VIA ROSAEV chargerELECTRICAL: MAIN PANEL UPGRADE TO 200A AND INSTALL LEVEL 2 EV CHARGING RECEPTACLE ...
2026-09-29BLDG-0926-848913922 RAMONA BLVDPlumbingPLUMBING TO INSTALL A NEW BACKFLOW PREVENTION DEVICE IN THE DESIGNATED GRASSY AREA...
2026-09-29BLDG-0926-848813916 RAMONA BLVDPlumbingPLUMBING TO REROUTE EXISTING WATER SERVICE LINE FROM ITS CURRENT LOCATION NEAR THE...
2026-09-29BLDG-0926-84903109 SYRACUSE AVEElectricalELECTRICAL: METER UPGRADE 200A AND INSTALL NEMA 14-50 EV OUTLET
2026-09-29BLDG-0926-843514634 VIA EL CAMINOElectricalELECTRICAL: INSTALL NEW 125A SUB PANEL - RE: BLDG 0826-8239
2026-09-29BLDG-0926-849113646 RAMONA BLVDInterior remodelWINDOW C/O: REPLACE 7 WINDOWS AND 1 SLIDING DOOR.

Access Baldwin Park permit data via API

Query Baldwin Park, California permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search Baldwin Park permits issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Baldwin%20Park&state=CA&issued_after=2026-09-23"

Sources for Baldwin Park

The official record sets behind this page, with the date each one's data runs through.

Record setSourcePermitsData throughNote
PermitsEnerGov permit portal10,4082026-09-30Upstream access blocked since 2026-08-18 (66d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Other cities we cover

Related coverage in California and nationwide.

FAQ

Where does PermitStack get Baldwin Park permit data?

We ingest Baldwin Park's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Baldwin Park data?

The newest permit we hold for Baldwin Park, California is dated September 30, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-08-18 (66d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Can I access Baldwin Park permits without an API key?

Yes — search Baldwin Park permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).

Can I export Baldwin Park permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.

How long does a Baldwin Park building permit take to issue?

Most Baldwin Park permits are issued on the same day they are filed, reflecting electronic submission and same-day processing for routine permit types. Larger or more complex projects (new construction, major additions) often take longer.

Get Baldwin Park permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key