Skip to content
DatasetsBuilding permitsContractor licencesCertificates of occupancyBuilding inspectionsCode violations and complaintsDevelopment pipelineCoverage & freshnessDatasets overview
ProductsAPIWeb searchEnterprise exportsAlerts & webhooksProperty historyAI connector (MCP)
SolutionsInsuranceLenders & CREReal estateRoofingHVACSolarContractors
PricingDocs
ResourcesBlogCompareGlossaryMethodologyStatus
Sign inGet free API key
California

Beaumont, California Building Permit Search

This page is not current. The newest Beaumont permit we hold is dated August 7, 2026. Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped. The page stays up for reference and returns to search results when the data is current again.

Access 50,892 building permits on record in Beaumont, California through a single REST API, normalized into a consistent schema. Data through August 7, 2026.

50,892
Total permits
1,491
Last 12 months
0
Last 30 days
-
Vs same period prior year
Aug 7, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types filed or issued in the last year.

New construction
275
Fire alarm
275
Solar
133
Battery
109
Roofing
68
Interior remodel
61
EV charger
61
Pool
33
Plumbing
31
Electrical
30

Permit data by trade in Beaumont

Drill into the most common permit categories in Beaumont.

Top contractors in Beaumont

The most active contractors by permit volume in Beaumont, with a profile of each one's permit history. Counts are permits we hold for Beaumont.

Permits by ZIP code in Beaumont

Permit activity for individual ZIP codes in Beaumont, newest first by volume.

Property history for Beaumont

Search held permit records for a Beaumont address through /v1/property/history, subject to source coverage, address matching, pagination and plan history limits. Dates and contractor fields may be missing; permit-date signals do not establish installation or current condition. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent held permits filed or issued in Beaumont, California, by issue date where the source publishes one and filing date otherwise. Search held records via the REST API within plan and pagination limits.

DatePermit #AddressCategoryDescription
2026-08-07 (filed)ELER2026-043035332 COUPLES CTEV chargerEV Charger - BLDG
2026-08-07 (filed)FP2026-031535504 STOCKTON STOtherFire - Battery Energy Storage Systems Residential
2026-08-07 (filed)BLDC2026-0040762 BEAUMONT AVEInterior remodelTenant Improvement - BLDG
2026-08-07 (filed)ELER2026-042835504 STOCKTON STSolarSolar Streamline Permit
2026-08-07 (filed)FP2026-03141447 BIG SKY DROtherFire - Battery Energy Storage Systems Residential
2026-08-07 (filed)PLMR2026-00921509 WILLOWHAVEN LNPlumbingGas Line (New) - BLDG
2026-08-07 (filed)ELER2026-042911010 COODY CTSolarSolar Streamline Permit
2026-08-07 (filed)ELER2026-04271447 BIG SKY DRSolarSolar Streamline Permit
2026-08-06 (filed)FP2026-03131732 OAK VALLEY PKWYFire alarmFire Alarm
2026-08-06FP2026-03121639 AMBER LILY DROtherFire - Battery Energy Storage Systems Residential

Access Beaumont permit data via API

Query a page of held Beaumont, California permit records. Address, category, status, dates and description depend on the source and may be missing or unknown.

# Search Beaumont permits filed or issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Beaumont&state=CA&date_after=2026-10-22"

Sources for Beaumont

The official record sets behind this page, with data-through dates where measured; missing dates remain unknown.

Record setSourcePermitsData throughNote
PermitsEnerGov permit portal50,8922026-08-07Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Other cities we cover

Related coverage in California and nationwide.

FAQ

Where does PermitStack get Beaumont permit data?

We ingest Beaumont's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Beaumont data?

The newest permit we hold for Beaumont, California is dated August 7, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Can I access Beaumont permits without an API key?

You need a free account, which needs no credit card. With it you can search Beaumont permits in the browser or call the API (100 requests per day; the free plan covers the last 30 days of permits).

Can I export Beaumont permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) attempt delivery of eligible matching records after ingestion. Source delays, matching windows, backlog, retries and endpoint availability affect arrival.

How long does a Beaumont building permit take to issue?

The median time from permit filing to issuance in Beaumont, California is 7 days, based on permits issued in the last 12 months. This is an aggregate of held records with both dates, not a forecast for a new application. Timing can vary by project scope, review requirements and source coverage.

Get Beaumont permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key