Skip to content
DatasetsBuilding permitsContractor licencesCertificates of occupancyBuilding inspectionsCode violations and complaintsDevelopment pipelineCoverage & freshnessDatasets overview
ProductsAPIWeb searchEnterprise exportsAlerts & webhooksProperty historyAI connector (MCP)
SolutionsInsuranceLenders & CREReal estateRoofingHVACSolarContractors
PricingDocs
ResourcesBlogCompareGlossaryMethodologyStatus
Sign inGet free API key
California

Cotati, California Building Permit Search

Access 1,145 building permits on record in Cotati, California through a single REST API, normalized into a consistent schema. Data through November 19, 2026.

1,145
Total permits
341
Last 12 months
35
Last 30 days
-
Vs same period prior year
Nov 19, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types filed or issued in the last year.

Roofing
77
HVAC
48
Plumbing
44
Electrical
42
Interior remodel
30
Solar
16
New construction
13
Grading
10
Demolition
8
EV charger
5

Permits by ZIP code in Cotati

Permit activity for individual ZIP codes in Cotati, newest first by volume.

Property history for Cotati

Search held permit records for a Cotati address through /v1/property/history, subject to source coverage, address matching, pagination and plan history limits. Dates and contractor fields may be missing; permit-date signals do not establish installation or current condition. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent held permits filed or issued in Cotati, California, by issue date where the source publishes one and filing date otherwise. Search held records via the REST API within plan and pagination limits.

DatePermit #AddressCategoryDescription
2026-11-19BP26-30815 BREEN WAYPlumbingResidential Plumbing Water Heater
2026-11-19BP26-30717 BREEN WAYPlumbingResidential Plumbing Water Heater
2026-11-18BP26-3037111 MARSH WAYInterior remodelResidential Building Renovation
2026-11-18BP26-3067111 MARSH WAYInterior remodelResidential Building Renovation
2026-11-18BP26-3057111 MARSH WAYInterior remodelResidential Building Renovation
2026-11-17 (filed)BP26-3048136 SUNFLOWER DRElectricalResidential Electrical Main Panel
2026-11-17BP26-2968780 LOGAN PLRoofingResidential Building Re-Roof
2026-11-17BP26-269855 RICHARDSON LNElectricalResidential Building Accessory Structure (over 120 sq. ft. or any structure w/ mec...
2026-11-17BP26-279113 FLAMINGO RDElectricalResidential Electrical Circuit
2026-11-16BP26-30218 GILBERT WAYInterior remodelResidential Building Renovation

Access Cotati permit data via API

Query a page of held Cotati, California permit records. Address, category, status, dates and description depend on the source and may be missing or unknown.

# Search Cotati permits filed or issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Cotati&state=CA&date_after=2026-10-22"

Sources for Cotati

The official record sets behind this page, with data-through dates where measured; missing dates remain unknown.

Record setSourcePermitsData throughNote
PermitsCloudpermit1,1452026-11-19

Other cities we cover

Related coverage in California and nationwide.

FAQ

Where does PermitStack get Cotati permit data?

We ingest Cotati's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Cotati data?

The newest permit we hold for Cotati, California is dated November 19, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.

Can I access Cotati permits without an API key?

You need a free account, which needs no credit card. With it you can search Cotati permits in the browser or call the API (100 requests per day; the free plan covers the last 30 days of permits).

Can I export Cotati permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) attempt delivery of eligible matching records after ingestion. Source delays, matching windows, backlog, retries and endpoint availability affect arrival.

How long does a Cotati building permit take to issue?

The median time from permit filing to issuance in Cotati, California is 4 days, based on permits issued in the last 12 months. This is an aggregate of held records with both dates, not a forecast for a new application. Timing can vary by project scope, review requirements and source coverage.

Get Cotati permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key