Skip to content
Products API & Data Search Coverage Property History Alerts For Contractors Data Exports
Solutions Solar & Energy Roofing HVAC Real Estate Insurance Lenders & CRE Contractors
Pricing Refer & Earn API Docs Sign In Get Started
California

Daly City, California Building Permit Search

This page is not current. The newest Daly City permit we hold is dated June 8, 2026. Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped. The page stays up for reference and returns to search results when the data is current again.

Access 15,865 building permits issued in Daly City, California through a single REST API, normalized into a consistent schema. Data through June 8, 2026.

15,865
Total permits
674
Last 12 months
0
Last 30 days
—
vs same period prior year
Jun 8, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

HVAC
236
Electrical
133
Plumbing
59
Solar
41
Interior remodel
39
Renovation
30
Mechanical
21
EV charger
16
Roofing
12
Addition
10

Permit data by trade in Daly City

Drill into the most common permit categories in Daly City.

Permits by ZIP code in Daly City

Permit activity for individual ZIP codes in Daly City, newest first by volume.

Property history for Daly City

Every permit we hold for one Daly City address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent permits issued in Daly City, California. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-06-08RBLD-09-25-110527205 SAGE STOther2022 Building Codes
2026-06-08RBLD-06-26-11446847 WEMBLEY DROther2025 BUILDING CODE
2026-06-08ELEC-06-26-11446544 EASTGATE DRElectrical2025 BUILDING CODE
2026-06-08RBLD-06-26-114470137 - MABUHAY WAYHVAC2025 Building Codes
2026-06-04PLUM-05-26-11421576 ROYCE WAYElectrical2025 Building Code
2026-06-04CBLD-04-24-102202500 WESTLAKE AVEPlumbingTI FOR DUGGAN'S SERRA MORTUARY
2026-06-04ELEC-05-26-114315500 WESTLAKE AVEElectricalTI FOR DUGGAN'S SERRA MORTUARY
2026-06-04PLUM-06-26-11443064 VICTORIA STHVAC2022 BUILDING CODES
2026-06-04RBLD-03-26-11318076 ROYCE WAYElectrical2025 Building Code
2026-06-04ELEC-06-26-11442864 VICTORIA STHVAC2022 BUILDING CODES

Access Daly City permit data via API

Query Daly City, California permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search Daly City permits issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Daly%20City&state=CA&issued_after=2026-09-06"

Sources for Daly City

The official record sets behind this page, with the date each one's data runs through.

Record setSourcePermitsData throughNote
PermitsEnerGov permit portal15,8652026-06-08Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Other cities we cover

Related coverage in California and nationwide.

FAQ

Where does PermitStack get Daly City permit data?

We ingest Daly City's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Daly City data?

The newest permit we hold for Daly City, California is dated June 8, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Can I access Daly City permits without an API key?

Yes — search Daly City permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).

Can I export Daly City permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.

How long does a Daly City building permit take to issue?

The median time from permit filing to issuance in Daly City, California is 19 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Daly City permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key