Access 186,068 building permits issued in Elk Grove, California through a single REST API. Refreshed daily from the official Elk Grove open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Elk Grove.
Most active contractors by permit volume in Elk Grove.
The 10 most recent permits issued in Elk Grove, California. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-26 | 26-03289 | 9077 DRAKE MEADOW WAY | Roofing | Re roof 35 squares com shingle |
| 2026-06-26 | 26-03294 | 8641 LODESTONE CIR | Roofing | PACKAGE UNIT CONVERSION (GAS TO ELECTRIC) ON ROOF |
| 2026-06-26 | 26-03315 | 9604 CRYSTAL BAY LN | HVAC | Convert gas HVAC to heat pump, 3 ton condenser system |
| 2026-06-26 | 26-03321 | 10288 JENNY LYNN WAY | HVAC | 3-ton Rheem 18/ SEER heat pump conversion split in attic. |
| 2026-06-26 | 26-03320 | 9355 LUFKIN WAY | Other | CONVERT TUB TO SHOWER ONLY |
| 2026-06-25 | 26-03296 | 5605 LAGUNA PARK DR | HVAC | C/O HVAC GAS SPLIT SYSTEM, 7S SUPPLIES,1 RETURN, 1250SQFT R8 |
| 2026-06-25 | 26-03299 | 6310 THRESHER CT | Renovation | Replace 2 windows in MDU like for like |
| 2026-06-25 | 26-03304 | 10057 VAN RUITEN LN | HVAC | C/O HVAC GAS SPLIT SYSTEM |
| 2026-06-25 | 26-03287 | 8439 ZINNIA WAY | HVAC | HVAC c/o like for like split system 3 ton |
| 2026-06-25 | 26-03291 | 5513 TARKENTON CT | HVAC | HVAC c/o heat pump split system 3 ton gas to elect |
Query Elk Grove, California permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Elk Grove permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Elk%20Grove&state=CA&issued_after=2026-04-01"
Related coverage in California and nationwide.
We ingest data directly from the official Elk Grove open data portal (ArcGIS Hub) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Elk Grove, California was issued on June 26, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Elk Grove permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Elk Grove, California is 4 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key