Skip to content
DatasetsBuilding permitsContractor licencesCertificates of occupancyBuilding inspectionsCode violations and complaintsDevelopment pipelineCoverage & freshnessDatasets overview
ProductsAPIWeb searchEnterprise exportsAlerts & webhooksProperty historyAI connector (MCP)
SolutionsInsuranceLenders & CREReal estateRoofingHVACSolarContractors
PricingDocs
ResourcesBlogCompareGlossaryMethodologyStatus
Sign inGet free API key
California

Elk Grove, California Building Permit Search

Access 189,443 building permits on record in Elk Grove, California through a single REST API, normalized into a consistent schema. Data through November 19, 2026.

189,443
Total permits
6,671
Last 12 months
452
Last 30 days
-31%
Vs same period prior year
Nov 19, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types filed or issued in the last year.

Solar
1,137
HVAC
1,087
Plumbing
930
New construction
814
Electrical
478
Mechanical
447
Renovation
380
Roofing
308
EV charger
299
Addition
232

Permit data by trade in Elk Grove

Drill into the most common permit categories in Elk Grove.

Top contractors in Elk Grove

The most active contractors by permit volume in Elk Grove, with a profile of each one's permit history. Counts are permits we hold for Elk Grove.

Permits by ZIP code in Elk Grove

Permit activity for individual ZIP codes in Elk Grove, newest first by volume.

Property history for Elk Grove

Search held permit records for a Elk Grove address through /v1/property/history, subject to source coverage, address matching, pagination and plan history limits. Dates and contractor fields may be missing; permit-date signals do not establish installation or current condition. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent held permits filed or issued in Elk Grove, California, by issue date where the source publishes one and filing date otherwise. Search held records via the REST API within plan and pagination limits.

DatePermit #AddressCategoryDescription
2026-11-1926-0613310321 TOURTINE WAYElectricalInstall a 40A GFCI circuit for a NEMA plug in garage.
2026-11-1926-061389178 MALDEN CTElectricalPANEL C/O LIKE FOR LIKE 125 AMP
2026-11-1926-061319109 FALCON CREEK CIRHVAC3 TON 15 SEER 13 EER ELECTRIC HEAT PUMP SPLIT SYSTEM
2026-11-1926-061277625 WAYANS WAYEV charger40 amp circuit, breaker + 32 amp hardwired EV charger
2026-11-1926-061348709 VIZELA WAYEV chargerInstall a 40A circuit for a hardwired EVSE in garage.
2026-11-1826-060443403 E ISLAND CTElectricalC/O TUB W/ WALK-IN TUB / 20AMP CIRCUIT FOR TUB / DRYWALL
2026-11-1826-0583610351 GRANT LINE RDDemolitionDEMO SINGLE FAMILY HOME
2026-11-1826-059139402 KILCOLGAN WAYSolarInstall 1x ESS OUTSIDE
2026-11-1826-060878576 BLUE MAIDEN WAYHVACC/O FURNACE ONLY - ATTIC
2026-11-1826-0610410353 LACOSTE WAYPlumbingINSTALL NEW OUTDOOR WATER SOFTNER

Access Elk Grove permit data via API

Query a page of held Elk Grove, California permit records. Address, category, status, dates and description depend on the source and may be missing or unknown.

# Search Elk Grove permits filed or issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Elk%20Grove&state=CA&date_after=2026-10-22"

Sources for Elk Grove

The official record sets behind this page, with data-through dates where measured; missing dates remain unknown.

Record setSourcePermitsData throughNote
Permitsopen data (ArcGIS)189,4432026-11-19

Other cities we cover

Related coverage in California and nationwide.

FAQ

Where does PermitStack get Elk Grove permit data?

We ingest Elk Grove's official permit records directly from ArcGIS Hub and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Elk Grove data?

The newest permit we hold for Elk Grove, California is dated November 19, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.

Can I access Elk Grove permits without an API key?

You need a free account, which needs no credit card. With it you can search Elk Grove permits in the browser or call the API (100 requests per day; the free plan covers the last 30 days of permits).

Can I export Elk Grove permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) attempt delivery of eligible matching records after ingestion. Source delays, matching windows, backlog, retries and endpoint availability affect arrival.

How long does an Elk Grove building permit take to issue?

The median time from permit filing to issuance in Elk Grove, California is 3 days, based on permits issued in the last 12 months. This is an aggregate of held records with both dates, not a forecast for a new application. Timing can vary by project scope, review requirements and source coverage.

Get Elk Grove permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key