Access 10,000 building permits issued in Imperial Beach, California through a single REST API. Refreshed daily from the official Imperial Beach open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
The 10 most recent permits issued in Imperial Beach, California. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-04-28 | TEP-26-0193 | 1117 ELDER | Other | Aerial Placement of Fiber |
| 2026-04-28 | TEP-26-0195 | 811 FLORENCE | Other | Exsisting drive way approach at property shall be removed and reconstructed per SD... |
| 2026-04-27 | TEP-26-0198 | 175 DAISY | Electrical | PROPOSED WORK IN THE RIGHT OF WAY FOR DRY AND WET UTILITIES |
| 2026-04-23 | TEP-26-0182 | 805 FLORIDA | Other | PROPOSED STRAND |
| 2026-04-22 | BLDR-25-0876 | 155 CITRUS | Other | convert existing area into JADU |
| 2026-04-22 | PLMR-26-0235 | 1203 CALIFORNIA | Plumbing | Excavate access trench at backyard planter to expose compromised cast iron/clay ma... |
| 2026-04-20 | PLMR-26-0225 | 1103 12TH | Plumbing | Excavate and expose the existing sewer line at the side yard cleanout. Perform cha... |
| 2026-04-20 | ELER-26-0208 | 900 BEVERLY | Electrical | Install the new 200amp meter panel on the south corner of the west wall, at existi... |
| 2026-04-20 | BLDR-25-0618 | 555 EMORY | Other | EXISTING DETACHED GARAGE TO BE PARTIALLY CONVERTED TO AN |
| 2026-04-13 | BLDC-26-0179 | 940 SEACOAST | Foundation | Permit is for the recordation of inspections of Portwood Pier Splash Pad improveme... |
Query Imperial Beach, California permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Imperial Beach permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Imperial%20Beach&state=CA&issued_after=2026-04-01"
Related coverage in California and nationwide.
We ingest data directly from the official Imperial Beach open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Imperial Beach, California was issued on April 28, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Imperial Beach permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Imperial Beach, California is 16 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key