Search Coverage Alerts Property History Solar & Energy Solar Permit Data Real Estate Insurance Contractors Pricing Blog API Docs Sign In Get API Key

Building Permits in Merced, California

Access 4,162 building permits issued in Merced, California through a single REST API. Refreshed daily from the official Merced open data portal and normalized into a consistent schema.

4,162
Total permits
363
Last 12 months
11
Last 30 days
-91%
vs same period prior year
Jun 5, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Solar
228
Plumbing
21
Roofing
19
Electrical
5
Grading
1
Interior remodel
1
Renovation
1
Fire alarm
1

Most recent permits

The 10 most recent permits issued in Merced, California. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-06-01AA-26-0301156 SOUTH FORKSolar10.935kW DC rooftop solar with battery backup
2026-05-26AA-26-02902108 PRINCEVILLESolar7.2kW DC rooftop solar with battery backup
2026-05-21AA-26-02653596 HAGENSolar14.52kW rooftop PV with Tesla Powerwall 3
2026-05-11AA-26-02711540 21STSolarRoof mounted solar 17 modules with battery expansion
2026-05-09AA-26-0268636 NORTHWOODSolarRoof mounted PV 5.28KW with energy storage
2026-05-09AA-26-0270929 EL PORTALSolar13.64kW DC rooftop solar with battery backup
2026-05-07AA-26-0262205 23RDSolarRoof mounted solar 13 modules with battery backup
2026-05-06AA-26-0263348 EDANSolarRoof mounted solar 13 modules with triple battery pack
2026-05-05AA-26-0237562 SUNSETSolarSolar and battery storage system installation
2026-05-05AA-26-02424019 NOTRE DAMESolarRoof mount solar 14 modules with energy storage

Access Merced permit data via API

Query Merced, California permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search all Merced permits issued this month
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Merced&state=CA&issued_after=2026-04-01"

Other cities we cover

Related coverage in California and nationwide.

FAQ

Where does PermitStack get Merced permit data?

We ingest data directly from the official Merced open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.

How current is the Merced data?

Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Merced, California was issued on June 5, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.

Can I access Merced permits without an API key?

Yes — our free tier includes 100 requests per day, enough to search and filter Merced permits interactively. Sign up for a free API key to get started.

Can I export Merced permit data?

Yes. Paid plans support CSV export and periodic webhooks for changed permits.

How long does a Merced building permit take to issue?

The median time from permit filing to issuance in Merced, California is 3 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Merced permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key