Access 162,329 building permits issued in Redding, California through a single REST API. Refreshed daily from the official Redding open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Redding.
Most active contractors by permit volume in Redding.
The 10 most recent permits issued in Redding, California. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-01 | BLDR-2026-03105 | 344 MOONSTONE | HVAC | Applied Online: Heat pump package unit on the roof change out. |
| 2026-08-01 | BLDR-2026-03103 | 1783 RECORD | Mechanical | Applied Online: SAME FOR SAME 3. 5 TON CONDENSER AND 3. 5 TON EVAPORATOR COIL |
| 2026-08-01 | BLDR-2026-03104 | 910 CHAMISE | HVAC | Applied Online: SAME FOR SAME 2 TON HEAT PUMP PACKAGE ON THE ROOF |
| 2026-07-31 | BLDR-2026-03098 | 1118 LAYTON | Electrical | REPLACE SUBPANEL FEEDERS FROM MAIN BREAKER TO SUBPANEL |
| 2026-07-31 | BLDR-2026-03090 | 4335 EMILY | Roofing | Tear off existing comp shingles, re-roof with comp shingles |
| 2026-07-31 | BLDR-2026-03101 | 3361 FOREST HILLS | Electrical | Adding Electrical Service for onsite waste Water pump |
| 2026-07-31 | EP-2026-03093 | 1725 GOLD | Renovation | Applied Online: Replace 9' x 3' and 5' x 6' sections of concrete f... |
| 2026-07-31 | BLDR-2026-03092 | 8696 PROSPECTORS | Roofing | TEAR-OFF AND RE-ROOF |
| 2026-07-31 | BLDR-2026-03091 | 1569 WALNUT | Electrical | Applied Online: Replace existing electrical panel and upgrade to a 225 Amp service... |
| 2026-07-31 | BLDR-2026-03094 | 1580 BARBARA | Roofing | TEAR-OFF AND RE-ROOF |
Query Redding, California permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Redding permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Redding&state=CA&issued_after=2026-04-01"
Related coverage in California and nationwide.
We ingest data directly from the official Redding open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Redding, California was issued on August 1, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Redding permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
Most Redding permits are issued on the same day they are filed, reflecting electronic submission and same-day processing for routine permit types. Larger or more complex projects (new construction, major additions) often take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key