PermitStack indexes 171,084 building permits issued in Aurora, Colorado, with 26,881 issued in the last 12 months alone. Search by address, contractor, category, and date via our free REST API.
Most common permit types issued in the last year.
Drill into the most common permit categories in Aurora.
The 10 most recent permits issued in Aurora, Colorado. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-14 | 26-2646561-000-00 | 325 N SABLE BLVD | Plumbing | BUILDINGONLINE | WATER HEATER REPLACEMENT LIKE FOR LIKE. |
| 2026-08-14 | 26-2646284-000-00 | 14501 E COLFAX AVE | Other | XCEL ENERGY - (1) ADA RAMP; 12' FLOW PAN; (1) 10'X10' BORE PIT; (1) 1&... |
| 2026-08-14 | 26-2646717-000-00 | 3741 S GIBRALTER ST | HVAC | INSTALL 80000 BTU FURNACE WITH AC UNIT --|STATE ELECTRICAL LICENSE: 16719 | -- |C... |
| 2026-08-14 | 26-2646557-000-00 | 325 N SABLE BLVD | Plumbing | BUILDINGONLINE | WATER HEATER REPLACEMENT LIKE FOR LIKE. |
| 2026-08-14 | 26-2646787-000-00 | 18233 E ARIZONA AVE | Plumbing | INSTALL WATER HEATER 40 GAL --|FLOOR: C | |
| 2026-08-14 | 26-2646892-000-00 | 14332 E 22ND PL | Renovation | BUILDINGONLINE | EGRESS WINDOW |
| 2026-08-14 | 26-2645919-000-00 | — | Other | ASPHALT PATCHBACK 600SF |
| 2026-08-14 | 26-2646686-000-00 | 11630 E WALSH PL | Roofing | -- |COMMENTS: T/O 1 LAYER AND REROOF WITH ASPHALT 17 SQS | | |
| 2026-08-14 | 26-2646849-000-00 | 994 S MEMPHIS WAY | Electrical | -- |COMMENTS: THE SERVICE IS UPGRADING TO 150 AMP| THE SERVICE TYPE IS UNDERGROUND... |
| 2026-08-14 | 26-2646484-000-00 | 14453 E JEWELL AVE | Electrical | BUILDINGONLINE | INDOOR ELECTRICAL FPE PANEL REPLACEMENT |
Query Aurora, Colorado permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Aurora permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Aurora&state=CO&issued_after=2026-04-01"
Related coverage in Colorado and nationwide.
We ingest data directly from the official Aurora open data portal (ArcGIS Hub) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Aurora, Colorado was issued on August 14, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Aurora permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in Aurora, Colorado is 1 day, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key