Access 598 building permits issued in East Granby, Connecticut through a single REST API. Refreshed daily from the official East Granby open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
The 10 most recent permits issued in East Granby, Connecticut. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-26 | OT-2026-317 | 102 NORTH MAIN STREET | Solar | Other New Solar panel, roof mount 102 N Main St |
| 2026-06-26 | E-2026-367 | 21 SOUTH MAIN STREET | Electrical | Electrical Remodel Service 25 S. Main Electrical |
| 2026-06-26 | P-2026-178 | 21 SOUTH MAIN STREET | Plumbing | Plumbing Remodel Other 25C/D Convert from business to R3 |
| 2026-06-25 | E-2026-364 | 14 METACOMET DRIVE | Electrical | Electrical Remodel Circuit Bathroom Remodel |
| 2026-06-25 | OT-2026-316 | 10 MOUNT VERNON DRIVE | Solar | Other Remodel Solar panel, roof mount Solar |
| 2026-06-25 | E-2026-366 | 33 BRADLEY PARK ROAD | Electrical | Electrical Remodel Circuit 33 bradley park |
| 2026-06-25 | E-2026-365 | 33 BRADLEY PARK ROAD | Electrical | Electrical Remodel Circuit 33 bradley park |
| 2026-06-24 | B-2026-625 | 212 NEWGATE ROAD | Other | Residential building Siding Single Family Dwelling Siding replacement |
| 2026-06-24 | M-2026-447 | 75 COPPER HILL ROAD | HVAC | HVAC Repair A/C York AC Replacement |
| 2026-06-24 | M-2026-446 | 10 SPOONVILLE ROAD | HVAC | HVAC New A/C 10 Spoonville |
Query East Granby, Connecticut permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all East Granby permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=East%20Granby&state=CT&issued_after=2026-04-01"
Related coverage in Connecticut and nationwide.
We ingest data directly from the official East Granby open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for East Granby, Connecticut was issued on June 26, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter East Granby permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in East Granby, Connecticut is 8 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key