Access 12,127 building permits issued in Milford, Delaware through a single REST API. Refreshed daily from the official Milford open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
The 10 most recent permits issued in Milford, Delaware. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-05 | BLDR-001756-2026 | 907 SE FRONT ST | Roofing | Replace shingles with 28ga standing seam metal |
| 2026-06-05 | BLDR-001687-2026 | 18384 PATCHWORK DR | Foundation | Single Family on slab |
| 2026-06-05 | BLDC-001744-2026 | 917 N DUPONT BLVD | Signage | PAN CHANNEL LETTER/LOGO SET. FLUSH MOUNTED TO ROUTED WHITE BACKER. On a raceway |
| 2026-06-04 | BLDR-001716-2026 | 18475 PATCHWORK DR | Other | Single family with basement |
| 2026-06-04 | BLDR-001714-2026 | 18393 PATCHWORK DR | Foundation | Single Family on slab |
| 2026-06-04 | BLDR-001688-2026 | 18459 PATCHWORK DR | Other | Single family w/basement |
| 2026-06-04 | BLDR-001695-2026 | 18388 PATCHWORK DR | Foundation | Single Family on slab |
| 2026-06-04 | BLDR-001718-2026 | 7622 NINE PATCH WAY | Other | enclose existing rear covered porch with Betterliving Sunrooms glass windows and door |
| 2026-06-04 | BLDR-001686-2026 | 18479 PATCHWORK DR | Other | Single Family w/basement |
| 2026-06-04 | BLDR-001715-2026 | 18427 PATCHWORK DR | Foundation | Single Family on Slab |
Query Milford, Delaware permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Milford permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Milford&state=DE&issued_after=2026-04-01"
Related coverage in Delaware and nationwide.
We ingest data directly from the official Milford open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Milford, Delaware was issued on June 5, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Milford permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Milford, Delaware is 20 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key