Skip to content
Products API & Data Search Coverage Property History Alerts For Contractors Data Exports
Solutions Solar & Energy Roofing HVAC Real Estate Insurance Lenders & CRE Contractors
Pricing Refer & Earn API Docs Sign In Get Started
Florida

Coral Gables, Florida Building Permit Search

Access 50,284 building permits issued in Coral Gables, Florida through a single REST API, normalized into a consistent schema. Data through August 9, 2026.

50,284
Total permits
9,645
Last 12 months
0
Last 30 days
—
vs same period prior year
Aug 9, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Electrical
1,982
Plumbing
1,393
Renovation
1,054
Roofing
794
Interior remodel
481
HVAC
465
Addition
454
Mechanical
323
New construction
256
Pool
255

Permit data by trade in Coral Gables

Drill into the most common permit categories in Coral Gables.

Top contractors in Coral Gables

The most active contractors by permit volume in Coral Gables, with a profile of each one's permit history. Counts are permits we hold for Coral Gables.

Permits by ZIP code in Coral Gables

Permit activity for individual ZIP codes in Coral Gables, newest first by volume.

Property history for Coral Gables

Every permit we hold for one Coral Gables address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent permits issued in Coral Gables, Florida. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-08-09PAFF-26-08-1143850 LUGO AVEHVACNew ductwork ,ac . ventilation as per plans
2026-08-09BLDR-26-08-97211341 BLUE RDRoofingNew Roof
2026-08-08SHOP-26-08-24371304 SAN REMO AVENew constructionNew 2-Story Single Family
2026-08-08ELEC-26-08-49051200 PONCE DE LEON BLVDElectrical***PRIVATE PROVIDER PACIFICA ENGINEERING SERVICES LLC FOR PLANS REVIEW AND INSPECT...
2026-08-08ELER-26-08-42161216 PLACETAS AVEElectricalSwimming pool electrical
2026-08-07PLUR-26-08-46775501 SNAPPER CREEK RDPlumbingInstallation of gas piping from existing riser to Standby generator
2026-08-07PLUR-26-08-4675824 GRANADA GROVES CTPlumbingOSTDS REPAIR APPROVED BY DOH
2026-08-07PWKS-26-08-4656495 BILTMORE WAYOtherFPL WR # 6829589
2026-08-07POSP-26-08-09412915 ALHAMBRA CIRPoolNEW SWIMMING POOL CONSTRUCTION
2026-08-07BLDB-26-08-4404427 BILTMORE WAYRoofingTEST FOR INSPECTION SCHEDULING DO NOT ROUTE/TOUCH

Access Coral Gables permit data via API

Query Coral Gables, Florida permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search Coral Gables permits issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Coral%20Gables&state=FL&issued_after=2026-09-06"

Sources for Coral Gables

The official record sets behind this page, with the date each one's data runs through.

Record setSourcePermitsData throughNote
PermitsEnerGov permit portal50,2842026-08-09Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Other cities we cover

Related coverage in Florida and nationwide.

FAQ

Where does PermitStack get Coral Gables permit data?

We ingest Coral Gables's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Coral Gables data?

The newest permit we hold for Coral Gables, Florida is dated August 9, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Can I access Coral Gables permits without an API key?

Yes — search Coral Gables permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).

Can I export Coral Gables permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.

How long does a Coral Gables building permit take to issue?

The median time from permit filing to issuance in Coral Gables, Florida is 21 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Coral Gables permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key