PermitStack indexes 37,015 building permits issued in Delray Beach, Florida, with 11,564 issued in the last 12 months alone. Search by address, contractor, category, and date via our free REST API.
Most common permit types issued in the last year.
Drill into the most common permit categories in Delray Beach.
The 10 most recent permits issued in Delray Beach, Florida. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-07-20 | LDEVR-017783-2026 | 29 SW 6th Ave | Other | removal of Carrotwood tree |
| 2026-07-20 | CO-017791-2026 | 2075 S Ocean Blvd | Other | Final 6/30/26 Closeout Permit |
| 2026-07-20 | CO-017785-2026 | 4581 WHITE CEDAR LN | Other | all work complete |
| 2026-07-20 | SIGN-017784-2026 | 1000 E Atlantic Ave | Signage | 2 ILLUMINATED WALL SIGNS |
| 2026-07-20 | REVISION-017803-2026 | 12 5TH AVE | Other | BRICKTOP REV // change path of egress manual activation K-Class Location |
| 2026-07-20 | GASR-017799-2026 | 708 SE 9th St | Other | New service |
| 2026-07-20 | BLDC-017804-2026 | 2905 SW 22nd Cir | Renovation | Replace 4 Sliders with same size impact |
| 2026-07-20 | PRVT-017786-2026 | 318 SE 5th Ave | Foundation | 071626 electric in slab level 2 north pour |
| 2026-07-20 | BLDR-017806-2026 | 3884 Layton Pointe Dr | New construction | New Single-Family Residential Construction |
| 2026-07-20 | PRVT-017778-2026 | 318 SE 5th Ave | Other | 071626 north dowels, 2nd floor deck steel partial |
Query Delray Beach, Florida permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Delray Beach permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Delray%20Beach&state=FL&issued_after=2026-04-01"
Related coverage in Florida and nationwide.
We ingest data directly from the official Delray Beach open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Delray Beach, Florida was issued on July 20, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Delray Beach permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Delray Beach, Florida is 30 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key