Skip to content
DatasetsBuilding permitsContractor licencesCertificates of occupancyBuilding inspectionsCode violations and complaintsDevelopment pipelineCoverage & freshnessDatasets overview
ProductsAPIWeb searchEnterprise exportsAlerts & webhooksProperty historyAI connector (MCP)
SolutionsInsuranceLenders & CREReal estateRoofingHVACSolarContractors
PricingDocs
ResourcesBlogCompareGlossaryMethodologyStatus
Sign inGet free API key
Florida

Deltona, Florida Building Permit Search

This page is not current. The newest Deltona permit we hold is dated August 9, 2026. Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped. The page stays up for reference and returns to search results when the data is current again.

Access 61,740 building permits on record in Deltona, Florida through a single REST API, normalized into a consistent schema. Data through August 9, 2026.

61,740
Total permits
4,864
Last 12 months
0
Last 30 days
-
Vs same period prior year
Aug 9, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types filed or issued in the last year.

Roofing
859
Renovation
758
HVAC
550
Fence
472
Electrical
411
Plumbing
351
New construction
190
Mechanical
179
Solar
178
Interior remodel
113

Permit data by trade in Deltona

Drill into the most common permit categories in Deltona.

Top contractors in Deltona

The most active contractors by permit volume in Deltona, with a profile of each one's permit history. Counts are permits we hold for Deltona.

Permits by ZIP code in Deltona

Permit activity for individual ZIP codes in Deltona, newest first by volume.

Property history for Deltona

Search held permit records for a Deltona address through /v1/property/history, subject to source coverage, address matching, pagination and plan history limits. Dates and contractor fields may be missing; permit-date signals do not establish installation or current condition. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent held permits filed or issued in Deltona, Florida, by issue date where the source publishes one and filing date otherwise. Search held records via the REST API within plan and pagination limits.

DatePermit #AddressCategoryDescription
2026-08-09 (filed)PLMC26-00142890 HOWLAND BLVDPlumbingPLUMBING
2026-08-07 (filed)BLDR26-2250789 ARLENE DRRenovationDOOR AND/OR WINDOW REPLACEMENT
2026-08-07 (filed)PLMR26-02873032 PARMA DRPlumbingPLUMBING RE-PIPE
2026-08-07BLDR26-2255493 TRADEWINDS DRRenovationDOOR AND/OR WINDOW REPLACEMENT
2026-08-07 (filed)SIGN26-00162160 HOWLAND BLVDElectricalSIGN ELECTRIC
2026-08-07PLMR26-02861077 HEMINGWAY DRPlumbingWATER HEATER REPLACEMENT
2026-08-07ELER26-0361901 WINDBROOK DRElectricalELECTRICAL REPAIR
2026-08-07ELER26-03621548 ENFIELD STElectricalELECTRICAL
2026-08-07BLDR26-22561137 ELKCAM BLVDRenovationDOOR AND/OR WINDOW REPLACEMENT
2026-08-07BLDR26-2254809 FRUITLAND DRRenovationDOOR AND/OR WINDOW REPLACEMENT

Access Deltona permit data via API

Query a page of held Deltona, Florida permit records. Address, category, status, dates and description depend on the source and may be missing or unknown.

# Search Deltona permits filed or issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Deltona&state=FL&date_after=2026-10-22"

Sources for Deltona

The official record sets behind this page, with data-through dates where measured; missing dates remain unknown.

Record setSourcePermitsData throughNote
PermitsEnerGov permit portal61,7402026-08-09Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Other cities we cover

Related coverage in Florida and nationwide.

FAQ

Where does PermitStack get Deltona permit data?

We ingest Deltona's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Deltona data?

The newest permit we hold for Deltona, Florida is dated August 9, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Can I access Deltona permits without an API key?

You need a free account, which needs no credit card. With it you can search Deltona permits in the browser or call the API (100 requests per day; the free plan covers the last 30 days of permits).

Can I export Deltona permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) attempt delivery of eligible matching records after ingestion. Source delays, matching windows, backlog, retries and endpoint availability affect arrival.

How long does a Deltona building permit take to issue?

The median filing-to-issue date gap in the qualifying held Deltona records rounds to 0 days. This includes permits issued in the last 12 months with both dates and nonnegative gaps of at most 365 days. Date fields do not establish the submission method or processing speed, and this aggregate is not a forecast for a new application.

Get Deltona permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key