Access 142,855 building permits issued in Doral, Florida through a single REST API. Refreshed daily from the official Doral open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Doral.
The 10 most recent permits issued in Doral, Florida. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-06 | BDCC-2608-4954 | 2272 NW 87 AVE | Interior remodel | Resubmission of plans. Reverting back to original plans as fitness room for Legend... |
| 2026-08-06 | ELRC-2608-1735 | 8245 CENTRAL PARK BLVD | EV charger | THIS WORK CONSISTS OF THE LEGALIZATION OF AN INSTALLATION OF A MINI SPLIT AND AN E... |
| 2026-08-06 | BDCC-2608-4956 | 10903 NW 83 ST | Interior remodel | 11002 NW 83rd St BLD 8 |
| 2026-08-06 | BDRC-2608-4859 | 11400 NW 67 TER | Interior remodel | bathroom remodel and extra shower |
| 2026-08-06 | BDCC-2608-4953 | 10903 NW 83 ST | Interior remodel | 10901 NW 83rd ST BLD 6 |
| 2026-08-06 | MECR-2608-0763 | 8245 CENTRAL PARK BLVD | EV charger | THIS WORK CONSISTS OF THE LEGALIZATION OF AN INSTALLATION OF A MINI SPLIT AND AN E... |
| 2026-08-06 | ELCC-2608-4731 | 10530 NW 51 ST | Signage | THE VILLAGE OF DORAL GLEN - ILLUMINATED ALUMINUM LETTERS MOUNTED ON EXISTING MONUM... |
| 2026-08-06 | BDCC-2608-4957 | 10903 NW 83 ST | Interior remodel | 11102 NW 83RD ST BLD 9 |
| 2026-08-06 | BDCC-2608-4955 | 10903 NW 83 ST | Interior remodel | 10902 NW 83rd St BLD 7 |
| 2026-08-06 | ELRC-2608-1734 | 8810 NW 103 PATH | Electrical | LEGALIZE EV CHARGER |
Query Doral, Florida permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Doral permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Doral&state=FL&issued_after=2026-04-01"
Related coverage in Florida and nationwide.
We ingest data directly from the official Doral open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Doral, Florida was issued on August 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Doral permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in Doral, Florida is 29 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key