Access 164,317 building permits issued in Doral, Florida through a single REST API. Refreshed daily from the official Doral open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Doral.
The 10 most recent permits issued in Doral, Florida. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-19 | BDCC-2606-4794 | 8140 GENEVA CT | Fence | Fence installation at front and rear of the property. |
| 2026-06-19 | BDRC-2606-4737 | 4715 NW 112 CT | Foundation | REPAIR CONCRETE SLAB AT PATIO |
| 2026-06-19 | BDRV-2606-3498 | 7841 NW 56 ST | Other | Revision to master permit bdcc2411-2922 |
| 2026-06-19 | SHOP-2606-1075 | 3515 NW 91 AVE | Other | Hollow metal doors and frames Florida Product Approval |
| 2026-06-19 | BDRV-2606-3497 | 10411 NW 28 ST | Other | ADDRESS REVISION PER INSPECTOR'S REQUEST |
| 2026-06-19 | BDCC-2606-4795 | 7791 NW 46 ST | Interior remodel | INTERIOR ALTERATION - NEW PARTITIONS & DRYWALL, DOORS & GRAL LIGHTING |
| 2026-06-19 | BDRV-2606-3500 | 10411 NW 28 ST | Other | ADDRESS CHANGE PER INSPECTOR'S REQUEST |
| 2026-06-19 | SHOP-2606-1076 | 3513 NW 91 AVE | Other | Hollow Metal Doors and Frames Florida Product Approval |
| 2026-06-19 | BDRV-2606-3499 | 10431 NW 28 ST | Other | ADDRESS CHANGE PER INSPECTOR'S REQUEST |
| 2026-06-19 | BDCC-2606-4793 | 7806 NW 46 ST | Interior remodel | Legalize 2 opening at warehouse, concrete and tie beam column reinforcementcheck |
Query Doral, Florida permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Doral permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Doral&state=FL&issued_after=2026-04-01"
Related coverage in Florida and nationwide.
We ingest data directly from the official Doral open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Doral, Florida was issued on June 19, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Doral permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Doral, Florida is 29 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key