Skip to content
Products API & Data Search Coverage Property History Alerts For Contractors Data Exports
Solutions Solar & Energy Roofing HVAC Real Estate Insurance Lenders & CRE Contractors
Pricing Refer & Earn API Docs Sign In Get Started
Florida

Doral, Florida Building Permit Search

Access 142,879 building permits issued in Doral, Florida through a single REST API, normalized into a consistent schema. Data through August 9, 2026.

142,879
Total permits
5,453
Last 12 months
0
Last 30 days
—
vs same period prior year
Aug 9, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Interior remodel
1,088
Electrical
832
Renovation
635
Roofing
394
HVAC
292
Mechanical
242
Signage
223
Fire alarm
205
Fence
147
Demolition
98

Permit data by trade in Doral

Drill into the most common permit categories in Doral.

Top contractors in Doral

The most active contractors by permit volume in Doral, with a profile of each one's permit history. Counts are permits we hold for Doral.

Permits by ZIP code in Doral

Permit activity for individual ZIP codes in Doral, newest first by volume.

Property history for Doral

Every permit we hold for one Doral address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent permits issued in Doral, Florida. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-08-09MECR-2608-07645243 NW 102 CTMechanicalAC CHANGE OUT WITH PRIVATE PROVIDER INSPECTION
2026-08-09BDCC-2608-49628012 NW 114 PLFenceFIX BY OWNER
2026-08-09BDRC-2608-486210109 NW 52 TERRenovationRemove and Replace 8 Windows to Impact Glazing, No Size Modifications
2026-08-09BDRC-2608-486111249 NW 62 TERRenovationRETROFIT (1) DOOR TO IMPACT RATED PRODUCTS
2026-08-07PWCA-2608-014211100 NW 27 STOtherConstruction Access Permit Submission Per Bakari Smith
2026-08-07RFCC-2608-08142745 NW 79 AVERoofingMetal re roof
2026-08-07MECC-2608-19208651 NW 13 TERMechanicalPRIVATE PROVIDER - Interior Renovation to Walmart Private provider inspections - U...
2026-08-07ELRC-2608-17365767 NW 99 CTElectricalElectrical permit for exterior residential lighting. Inspect existing installation...
2026-08-07SIGN-2608-01498353 NW 36 STSignageWindow Signs
2026-08-07BDCC-2608-49608175 NW 107 AVESignageSignage for Suite 103

Access Doral permit data via API

Query Doral, Florida permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search Doral permits issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Doral&state=FL&issued_after=2026-09-06"

Sources for Doral

The official record sets behind this page, with the date each one's data runs through.

Record setSourcePermitsData throughNote
PermitsEnerGov permit portal142,8792026-08-09Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Other cities we cover

Related coverage in Florida and nationwide.

FAQ

Where does PermitStack get Doral permit data?

We ingest Doral's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Doral data?

The newest permit we hold for Doral, Florida is dated August 9, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Can I access Doral permits without an API key?

Yes — search Doral permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).

Can I export Doral permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.

How long does a Doral building permit take to issue?

The median time from permit filing to issuance in Doral, Florida is 29 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Doral permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key