Access 26,817 building permits issued in Fernandina Beach, Florida through a single REST API. Refreshed daily from the official Fernandina Beach open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Fernandina Beach.
The 10 most recent permits issued in Fernandina Beach, Florida. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-21 | ELER-2026-0234 | 1496 1ST | Electrical | PROVIDE POWER TO 1 ea 2.0 AMP MOTOR |
| 2026-08-21 | ZON-000110-2026 | 224 11TH | Fence | Moving one section of 6-foot wood fencing to run adjacent to the property line |
| 2026-08-21 | PLBR-2026-0226 | 3438 FIRST | Plumbing | new home |
| 2026-08-21 | BLDR-2026-0557 | 303 8TH | Renovation | We are restoring a burned structure. |
| 2026-08-21 | PLBR-2026-0228 | 3426 1ST | Plumbing | new home |
| 2026-08-21 | PLBR-2026-0225 | 1860 HIGHLAND | Plumbing | WE WILL BE REMOVING ALL OLD SEWER LINES TO HOME AND REPLCING WITH NEW TO THE CITY ... |
| 2026-08-21 | PLBR-2026-0230 | 84 BROADBENT | Plumbing | new garage plumbing |
| 2026-08-21 | PLBR-2026-0229 | 84 BROADBENT | Plumbing | new home plumbing |
| 2026-08-21 | ELER-2026-0235 | 748 MAGNOLIA BLUFF | Electrical | install a new dedicated electrical circuit for the dehumidifier. |
| 2026-08-21 | PLBR-2026-0227 | 3432 1ST | Plumbing | new home |
Query Fernandina Beach, Florida permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Fernandina Beach permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Fernandina%20Beach&state=FL&issued_after=2026-04-01"
Related coverage in Florida and nationwide.
We ingest data directly from the official Fernandina Beach open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Fernandina Beach, Florida was issued on August 21, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Fernandina Beach permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in Fernandina Beach, Florida is 6 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key