Skip to content
Products API & Data Search Coverage Property History Alerts For Contractors Data Exports
Solutions Solar & Energy Roofing HVAC Real Estate Insurance Lenders & CRE Contractors
Pricing Refer & Earn API Docs Sign In Get Started
Florida

Hallandale Beach, Florida Building Permit Search

Access 124,260 building permits issued in Hallandale Beach, Florida through a single REST API, normalized into a consistent schema. Data through August 9, 2026.

124,260
Total permits
1,853
Last 12 months
0
Last 30 days
—
vs same period prior year
Aug 9, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Electrical
348
Renovation
313
Interior remodel
241
Plumbing
207
Mechanical
177
HVAC
155
Roofing
100
Fence
58
Fire alarm
35
New construction
35

Permit data by trade in Hallandale Beach

Drill into the most common permit categories in Hallandale Beach.

Permits by ZIP code in Hallandale Beach

Permit activity for individual ZIP codes in Hallandale Beach, newest first by volume.

Property history for Hallandale Beach

Every permit we hold for one Hallandale Beach address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent permits issued in Hallandale Beach, Florida. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-08-09ONS-26-02941320 NW 5 AVEOtherSTAMPED CONCRETE DRIVEWAY
2026-08-09ALT-26-029423180 S OCEAN DRInterior remodelExisting Bathroom Remodel.
2026-08-09OSR-26-02943(PRIV PROV PLNS INSP) 201 DIPLOMATMechanicalPRIV PROV MECHANICAL/ARCHITECTURAL LOUVER SCREENS
2026-08-08ALT-26-029401865 S OCEAN DRInterior remodelFLORING REPLECEMENT EXCEPT BATHROOMS
2026-08-07ALT-26-029333180 S OCEAN DRInterior remodelRelocate kitchen Island, build partitions as shown, install doors and vanity in Ma...
2026-08-07OSR-26-02936645 W HALLANDALE BEACH BLVDElectricalINSTALLATION OF NEW ACCESS CONTROL SYSTEM
2026-08-07ALT-26-029301920 S OCEAN DRInterior remodelBathroom remodel: Shower to shower
2026-08-07OSR-26-02931500 THREE ISLANDS BLVDHVACAC Change Out
2026-08-07ONS-26-029381945 S OCEAN DRIVEPoolResurfacing Pool & Spa
2026-08-07OSR-26-029341100 NE 1 CTHVACCHANGEOUT 1.5T HVAC

Access Hallandale Beach permit data via API

Query Hallandale Beach, Florida permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search Hallandale Beach permits issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Hallandale%20Beach&state=FL&issued_after=2026-09-06"

Sources for Hallandale Beach

The official record sets behind this page, with the date each one's data runs through.

Record setSourcePermitsData throughNote
PermitsEnerGov permit portal124,2602026-08-09Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Other cities we cover

Related coverage in Florida and nationwide.

FAQ

Where does PermitStack get Hallandale Beach permit data?

We ingest Hallandale Beach's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Hallandale Beach data?

The newest permit we hold for Hallandale Beach, Florida is dated August 9, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Can I access Hallandale Beach permits without an API key?

Yes — search Hallandale Beach permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).

Can I export Hallandale Beach permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.

How long does a Hallandale Beach building permit take to issue?

The median time from permit filing to issuance in Hallandale Beach, Florida is 17 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Hallandale Beach permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key