Access 7,183 building permits issued in Hernando County, Florida through a single REST API. Refreshed daily from the official Hernando County open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Hernando County.
The 10 most recent permits issued in Hernando County, Florida. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-09 | SIC-002401-2026 | 9365 GRANDE PARK DR | HVAC | HVAC system replacement for unit 6455 |
| 2026-08-09 | BLDC-000594-2026 | — | New construction | Install hanger #2 |
| 2026-08-09 | SIC-002400-2026 | 6568 PINE MEADOWS DR | Roofing | Remove existing shingle roof and replace with new dimensional shingle roof |
| 2026-08-09 | SIC-002399-2026 | 6558 PINE MEADOWS DR | Roofing | Remove existing shingle roof and replace with new dimensional shingle roof |
| 2026-08-08 | SIC-002394-2026 | 8436 ANNAPOLIS RD | Renovation | Remove and Replace 3 Windows, Size for size |
| 2026-08-08 | POOL(R)-000170-2026 | 15171 HIGHFIELD RD | Pool | PAPER PACKET |
| 2026-08-08 | SIC-002398-2026 | 9752 ELDRIDGE RD | Renovation | Remove and Replace 9 Windows, Size for size |
| 2026-08-08 | SIC-002391-2026 | 7187 LEXINGTON CIR | Renovation | Remove and Replace 3 Windows, Size for size |
| 2026-08-08 | SIC-002396-2026 | 4330 GOLDCOAST AVE | Renovation | Remove and Replace 2 Windows and 1 Entry Door, Size for size |
| 2026-08-08 | SIC-002389-2026 | 15415 EASTWOOD TRL | Renovation | Remove and Replace 10Windows / 2SGD / 2Doors, Size for size |
Query Hernando County, Florida permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Hernando County permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Hernando%20County&state=FL&issued_after=2026-04-01"
Related coverage in Florida and nationwide.
We ingest data directly from the official Hernando County open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Hernando County, Florida was issued on August 9, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Hernando County permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
Most Hernando County permits are issued on the same day they are filed, reflecting electronic submission and same-day processing for routine permit types. Larger or more complex projects (new construction, major additions) often take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key