Skip to content
DatasetsBuilding permitsContractor licencesCertificates of occupancyBuilding inspectionsCode violations and complaintsDevelopment pipelineCoverage & freshnessDatasets overview
ProductsAPIWeb searchEnterprise exportsAlerts & webhooksProperty historyAI connector (MCP)
SolutionsInsuranceLenders & CREReal estateRoofingHVACSolarContractors
PricingDocs
ResourcesBlogCompareGlossaryMethodologyStatus
Sign inGet free API key
Florida

Homestead, Florida Building Permit Search

This page is not current. The newest Homestead permit we hold is dated August 9, 2026. Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped. The page stays up for reference and returns to search results when the data is current again.

Access 809 building permits on record in Homestead, Florida through a single REST API, normalized into a consistent schema. Data through August 9, 2026.

809
Total permits
758
Last 12 months
0
Last 30 days
-
Vs same period prior year
Aug 9, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types filed or issued in the last year.

Renovation
356
Plumbing
130
Mechanical
52
Electrical
46
Pool
38
Foundation
22
Demolition
18
HVAC
7
Roofing
5
Signage
1

Property history for Homestead

Search held permit records for a Homestead address through /v1/property/history, subject to source coverage, address matching, pagination and plan history limits. Dates and contractor fields may be missing; permit-date signals do not establish installation or current condition. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent held permits filed or issued in Homestead, Florida, by issue date where the source publishes one and filing date otherwise. Search held records via the REST API within plan and pagination limits.

DatePermit #AddressCategoryDescription
2026-08-09 (filed)BD-26-01074-BL-R747 SE 27TH DRRenovationRemove and replace remaining non-impact windows, sliding glass doors, and front en...
2026-08-09 (filed)BD-26-01075-BL-R465 SE 23RD LNRenovationImpact front door
2026-08-07 (filed)BD-26-01072-BL-R31825 SW 187TH PLRenovationIMPACT DOORS AFTER THE FACT
2026-08-07 (filed)BD-26-00056-ME-R47 NW 16TH STMechanical2 Units Change Out
2026-08-07 (filed)BD-26-01073-BL-R627 SE 27TH DRRenovationInstallation of Impact windows & doors.
2026-08-07 (filed)BD-26-01071-BL-R31825 SW 187TH PLDemolitionSTRUCTURE DEMOLITION BACK OF THE HOUSE
2026-08-06 (filed)BD-26-00055-ME-R1230 KIA DRMechanicalA/C CHANGE OUT 3 TONS, 5 K.W.
2026-08-06 (filed)BD-26-01065-BL-R1770 SE 20TH TERRenovationREPLACING 2 DOORS W/ IMPACT SIZE FOR SIZE
2026-08-06 (filed)BD-26-01062-BL-R1452 SE 24TH AVERenovationreplace 7 windows in existing location
2026-08-05 (filed)BD-26-01060-BL-R955 NE 5TH AVERenovationReplacement of 10 existing windows and 2 new opening exterior doors.

Access Homestead permit data via API

Query a page of held Homestead, Florida permit records. Address, category, status, dates and description depend on the source and may be missing or unknown.

# Search Homestead permits filed or issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Homestead&state=FL&date_after=2026-10-22"

Sources for Homestead

The official record sets behind this page, with data-through dates where measured; missing dates remain unknown.

Record setSourcePermitsData throughNote
PermitsEnerGov permit portal8092026-08-09Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Other cities we cover

Related coverage in Florida and nationwide.

FAQ

Where does PermitStack get Homestead permit data?

We ingest Homestead's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Homestead data?

The newest permit we hold for Homestead, Florida is dated August 9, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Can I access Homestead permits without an API key?

You need a free account, which needs no credit card. With it you can search Homestead permits in the browser or call the API (100 requests per day; the free plan covers the last 30 days of permits).

Can I export Homestead permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) attempt delivery of eligible matching records after ingestion. Source delays, matching windows, backlog, retries and endpoint availability affect arrival.

How long does a Homestead building permit take to issue?

The median time from permit filing to issuance in Homestead, Florida is 48 days, based on permits issued in the last 12 months. This is an aggregate of held records with both dates, not a forecast for a new application. Timing can vary by project scope, review requirements and source coverage.

Get Homestead permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key