Skip to content
Products API & Data Search Coverage Property History Alerts For Contractors Data Exports
Solutions Solar & Energy Roofing HVAC Real Estate Insurance Lenders & CRE Contractors
Pricing Refer & Earn API Docs Sign In Get Started
Florida

Miami Beach, Florida Building Permit Search

PermitStack indexes 212,126 building permits issued in Miami Beach, Florida, with 18,211 issued in the last 12 months alone. Search by address, contractor, category, and date via our free REST API.

212,126
Total permits
18,211
Last 12 months
1,370
Last 30 days
-19%
vs same period prior year
Oct 5, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Electrical
2,824
Plumbing
2,633
Renovation
1,669
Interior remodel
1,512
HVAC
1,427
Mechanical
1,329
Roofing
824
Fire alarm
509
Demolition
434
Fence
385

Permit data by trade in Miami Beach

Drill into the most common permit categories in Miami Beach.

Permits by ZIP code in Miami Beach

Permit activity for individual ZIP codes in Miami Beach, newest first by volume.

Property history for Miami Beach

Every permit we hold for one Miami Beach address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent permits issued in Miami Beach, Florida. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-10-05BCR2605347401 OCEAN DRInterior remodelKitchen and bathroom remodeling and new flooring no balcony
2026-10-05BC2628770101 COLLINS AVEInterior remodelUNIT #3 / BVC23001118 & BVM22000153 --- PERMIT FOR EXISTING INTERIOR ALTERATIO...
2026-10-05PLSPC26006822301 COLLINS AVEPlumbingUnit:802 ---- RELOCATION OF RESTROOM AND ADDITION OF ONE NEW BATHROOM, NE WKTICHEN...
2026-10-05BC2628773401 OCEAN DRInterior remodelKitchen and bathroom remolding and new flooring no balcony work
2026-10-05BR2612040930 STILLWATER DROtherThe project proposed to install a new dock and boatlift.
2026-10-05ELR26059374335 ROYAL PALM AVEElectricalBR2510633 // Temp for Test
2026-10-05PLSPC26006835825 COLLINS AVEPlumbingBCR2605327 // Unit 14j // INSTALL SHOWER PAN-SHOWER VALVE-TOILET-SINK & FAUCET...
2026-10-05ODC26-0524110 WASHINGTON AVEOtherPURA VIDA MIAMI - 110 Washington Ave CU-2 Sidewalk Cafe: 227 SQ FT, 10 Seats, 4 Ta...
2026-10-05PLSPC26006891688 WEST AVEPlumbing#107/ (change shower valve) (tub to remain ( tub area work only)
2026-10-05ODC26-0523918 OCEAN DROtherTHE LOCUST - 918 Ocean Drive Sidewalk Cafe: 352 SQ FT, 20 Seats, 8 Tables, 3 Umbre...

Access Miami Beach permit data via API

Query Miami Beach, Florida permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search Miami Beach permits issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Miami%20Beach&state=FL&issued_after=2026-09-06"

Sources for Miami Beach

The official record sets behind this page, with the date each one's data runs through.

Record setSourcePermitsData throughNote
PermitsEnerGov permit portal212,1262026-10-05

Other cities we cover

Related coverage in Florida and nationwide.

FAQ

Where does PermitStack get Miami Beach permit data?

We ingest Miami Beach's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Miami Beach data?

The newest permit we hold for Miami Beach, Florida is dated October 5, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.

Can I access Miami Beach permits without an API key?

Yes — search Miami Beach permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).

Can I export Miami Beach permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.

How long does a Miami Beach building permit take to issue?

The median time from permit filing to issuance in Miami Beach, Florida is 29 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Miami Beach permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key