Access 120,494 building permits issued in Miami Gardens, Florida through a single REST API. Refreshed daily from the official Miami Gardens open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Miami Gardens.
Most active contractors by permit volume in Miami Gardens.
The 10 most recent permits issued in Miami Gardens, Florida. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-06 | ROOF-2026-003907 | 1531 154TH | Roofing | RE-ROOF SHINGLES AND FLAT |
| 2026-08-06 | BLDC-2026-001019 | 3950 167TH | Interior remodel | Establish existing occupancies as directed by the Miami-Dade Fire Dept.. Permit ap... |
| 2026-08-06 | BLDC-2026-001020 | 3888 167TH | Interior remodel | Establish existing occupancies as directed by the Miami-Dade Fire Dept.. Permit ap... |
| 2026-08-06 | SOLR-2026-000406 | 15801 37TH | Solar | Mount and electrica photovoltaic system. Solar Panel Installation |
| 2026-08-06 | BLDR-2026-004665 | 821 207TH | Renovation | REPLACE 12 WINDOW TO IMPACT AND ONE DOOR |
| 2026-08-06 | ELEC-2026-000944 | 17950 27TH | Electrical | BURGLAR ALARM FOR TACO BELL |
| 2026-08-06 | BLDR-2026-004666 | 3401 171ST | Other | DRIVEWAY AND APPROACH. |
| 2026-08-06 | ROOF-2026-003910 | 20750 7TH | Roofing | Re-Roof Metal Roofing system |
| 2026-08-06 | ELEC-2026-000942 | — | Electrical | Electrical application for NW 27TH AVE and 199th ST for Miami Gardens PD. The perm... |
| 2026-08-06 | ROOF-2026-003906 | 1961 187TH | Roofing | RE-ROOF FLAT |
Query Miami Gardens, Florida permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Miami Gardens permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Miami%20Gardens&state=FL&issued_after=2026-04-01"
Related coverage in Florida and nationwide.
We ingest data directly from the official Miami Gardens open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Miami Gardens, Florida was issued on August 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Miami Gardens permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in Miami Gardens, Florida is 13 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key