Skip to content
Products API & Data Search Coverage Property History Alerts For Contractors Data Exports
Solutions Solar & Energy Roofing HVAC Real Estate Insurance Lenders & CRE Contractors
Pricing Refer & Earn API Docs Sign In Get Started
Florida

Miami Gardens, Florida Building Permit Search

Access 120,512 building permits issued in Miami Gardens, Florida through a single REST API, normalized into a consistent schema. Data through August 9, 2026.

120,512
Total permits
5,356
Last 12 months
0
Last 30 days
—
vs same period prior year
Aug 9, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Roofing
1,230
Renovation
814
Electrical
738
Plumbing
473
Fence
445
Interior remodel
321
HVAC
264
Mechanical
111
Solar
107
New construction
86

Permit data by trade in Miami Gardens

Drill into the most common permit categories in Miami Gardens.

Top contractors in Miami Gardens

The most active contractors by permit volume in Miami Gardens, with a profile of each one's permit history. Counts are permits we hold for Miami Gardens.

Permits by ZIP code in Miami Gardens

Permit activity for individual ZIP codes in Miami Gardens, newest first by volume.

Property history for Miami Gardens

Every permit we hold for one Miami Gardens address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent permits issued in Miami Gardens, Florida. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-08-09ELER-2026-00116819615 NW 14TH AVEElectricalReplace electric meter,install new 200 amp meter main combo
2026-08-09BLDR-2026-0046773624 NW 190TH STRenovation(9) Windows and (2) Doors Replacement
2026-08-09BLDC-2026-0010211811 NW 183RD STRenovationSTOREFRONT SHOP DRAWINGS
2026-08-07BLDR-2026-0046741200 NW 203RD STOtherBrick Pavers Driveway
2026-08-07BLDR-2026-0046753222 NW 182ND STFencenew dura fence , picket fence and gates
2026-08-07ELER-2026-00116715801 NW 37TH PLElectricalNew Subpanel
2026-08-07BLDR-2026-0046763217 NW 179TH STRenovationREMOVE AND REPALCE 2 DOORS AND 14 WINDOWS
2026-08-07ROOF-2026-0039132281 NW 153RD STRoofingREROOF FLAT
2026-08-07ENGR-2026-0008601135 NW 159TH DROtherWR 14954423 Install ABC 2000KVA PMTX (277/480V) RADIAL, ~502-FT PULL UG PRIMARY CA...
2026-08-07ROOF-2026-00391420105 NW 27TH CIRRoofingreroof of the shingle roof

Access Miami Gardens permit data via API

Query Miami Gardens, Florida permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search Miami Gardens permits issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Miami%20Gardens&state=FL&issued_after=2026-09-06"

Sources for Miami Gardens

The official record sets behind this page, with the date each one's data runs through.

Record setSourcePermitsData throughNote
PermitsEnerGov permit portal120,5122026-08-09Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Other cities we cover

Related coverage in Florida and nationwide.

FAQ

Where does PermitStack get Miami Gardens permit data?

We ingest Miami Gardens's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Miami Gardens data?

The newest permit we hold for Miami Gardens, Florida is dated August 9, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Can I access Miami Gardens permits without an API key?

Yes — search Miami Gardens permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).

Can I export Miami Gardens permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.

How long does a Miami Gardens building permit take to issue?

The median time from permit filing to issuance in Miami Gardens, Florida is 13 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Miami Gardens permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key