Access 27,934 building permits issued in Miramar, Florida through a single REST API. Refreshed daily from the official Miramar open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Miramar.
The 10 most recent permits issued in Miramar, Florida. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-07-20 | ELEC-000574-0726 | 2400 145TH | Electrical | SOUTHERN GLAZER - INSTALL ACCESS CONTROL FOR 2400 BLDG LVL 1 & 2 : MASTER PERM... |
| 2026-07-20 | BLDC-009784-2026 | 16801 MIRAMAR | Other | CITY PROJECT: INSTALL TEMPORARY CANOPIES FOR MIRAMAR HIGH ALL ALUMNI REUNION PICNI... |
| 2026-07-20 | MECC-009796-2026 | 2750 145TH | HVAC | Interior build-out of existing office including HVAC system modifications, new duc... |
| 2026-07-20 | BLDR-009780-2026 | 1938 151ST | Other | REPLACING 1 DOOR TO IMPACT |
| 2026-07-20 | BLDR-009785-2026 | 9601 ENCINO | Renovation | REPLACE 9 WINDOWS AND 2 DOORS |
| 2026-07-20 | BLDR-009783-2026 | 3650 166TH | Fence | Install approx 105' of 4' Alm fence with two gates |
| 2026-07-20 | BLDR-009770-2026 | 14855 39TH | Other | Replacing 5 Windows and 2 Doors to Impact Glazing. |
| 2026-07-20 | BLDR-009807-2026 | 1938 151ST | Other | Concrete Driveway |
| 2026-07-20 | BLDR-009781-2026 | 11331 20TH | Renovation | REPLACE 7 WINDOWS AND 2 DOORS |
| 2026-07-20 | GARR-000099-072026 | 13651 19TH | Other | JULY 24TH - 26TH, 2026 |
Query Miramar, Florida permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Miramar permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Miramar&state=FL&issued_after=2026-04-01"
Related coverage in Florida and nationwide.
We ingest data directly from the official Miramar open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Miramar, Florida was issued on July 20, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Miramar permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Miramar, Florida is 40 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key