Skip to content
Products API & Data Search Coverage Property History Alerts For Contractors Data Exports
Solutions Solar & Energy Roofing HVAC Real Estate Insurance Lenders & CRE Contractors
Pricing Refer & Earn API Docs Sign In Get Started
Florida

New Port Richey, Florida Building Permit Search

Access 52,790 building permits issued in New Port Richey, Florida through a single REST API, normalized into a consistent schema. Data through August 7, 2026.

52,790
Total permits
1,517
Last 12 months
0
Last 30 days
—
vs same period prior year
Aug 7, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Roofing
239
Renovation
222
Interior remodel
165
HVAC
137
Demolition
121
Electrical
113
Plumbing
94
Fence
89
Mechanical
84
Signage
33

Permit data by trade in New Port Richey

Drill into the most common permit categories in New Port Richey.

Permits by ZIP code in New Port Richey

Permit activity for individual ZIP codes in New Port Richey, newest first by volume.

Property history for New Port Richey

Every permit we hold for one New Port Richey address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent permits issued in New Port Richey, Florida. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-08-07ROOF-26-08-07876631 BALLAD LNRoofingRemove existing and replace with peel and stick and shingle
2026-08-07BLDR-26-08-07026435 VAN BUREN STInterior remodelBATHROOM REMODEL AND CARPORT ENCLOSURE FOR STORAGE ONLY
2026-08-07WNDR-26-08-05337202 OAKWOOD DRRenovationBETTER FUTURE PROGRAM
2026-08-07MECH-26-08-06776234 ARTHUR AVEMechanicalEQUAL CHANGE OUT AMANA 3.5 TON HP
2026-08-07WNDR-26-08-05326145 WILDS DRRenovationREPLACING 1 DOOR SIZE FOR SIZE - PP FOR INSPECTIONS
2026-08-07MECH-26-08-06756516 REMUS DRMechanicalEqual AC Change Out
2026-08-07ALUM-26-08-00346828 HILLS DROther26'5" x 36' screen enclosure
2026-08-07FENC-26-08-02726008 BOXWOODFenceINSTALL 6' HIGH PVC FENCE AND 3' HIGH PVC PICKET FENCE - VARIANCE
2026-08-07FENC-26-08-02716126 MAIN STFenceINSTALL 100 LF OF 3' HIGH PVC PICKET FENCE
2026-08-07ROOF-26-08-07886929 MC BRIDERoofingReroof of home using synthetic underlayment and GAF shingles

Access New Port Richey permit data via API

Query New Port Richey, Florida permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search New Port Richey permits issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=New%20Port%20Richey&state=FL&issued_after=2026-09-06"

Sources for New Port Richey

The official record sets behind this page, with the date each one's data runs through.

Record setSourcePermitsData throughNote
PermitsEnerGov permit portal52,7902026-08-07Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Other cities we cover

Related coverage in Florida and nationwide.

FAQ

Where does PermitStack get New Port Richey permit data?

We ingest New Port Richey's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the New Port Richey data?

The newest permit we hold for New Port Richey, Florida is dated August 7, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Can I access New Port Richey permits without an API key?

Yes — search New Port Richey permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).

Can I export New Port Richey permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.

How long does a New Port Richey building permit take to issue?

The median time from permit filing to issuance in New Port Richey, Florida is 6 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get New Port Richey permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key