Access 113,955 building permits issued in Okeechobee County, Florida through a single REST API, normalized into a consistent schema. Data through August 8, 2026.
Most common permit types issued in the last year.
Drill into the most common permit categories in Okeechobee County.
Every permit we hold for one Okeechobee County address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.
The 10 most recent permits issued in Okeechobee County, Florida. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-08 | TT-2608-2667 | 2700 S 441 | Other | Install Temporary Canopy 40' x 80' for seasonal Christmas tree sales 11/20... |
| 2026-08-07 | CRSL-2608-2666 | 2328 NE 103rd AVE | Foundation | Adding a 30'x34' slab 4" thick, 4000psi w fibermesh. 12"x12"... |
| 2026-08-07 | RR-2608-2663 | 5745 NW 20TH ST | Renovation | Replace windows, front and back door and siding on house |
| 2026-08-07 | RAS-2608-2659 | 13200 SE 441 | HVAC | CBS-12X24 STORAGE BUILDING NO POWER NO WATER NO A/C SQ300 |
| 2026-08-07 | RBLD-2608-2664 | 17481 NW 38th AVE | New construction | Rebuild FLorida: New Construction home. *private provider inspections and review* ... |
| 2026-08-07 | EL-2608-2660 | 2822 SE 47th TER | Electrical | New 200a feed from main to panel. update grounding system and install surge protec... |
| 2026-08-07 | SFRD-2608-2661 | 17510 NW 38th AVE | New construction | TEMP PAVED APRON AND MITTER ENDS..NEW BUILD IS 1 1/2 OUT |
| 2026-08-07 | RRF-2608-2665 | 13860 SE 126th TER | Roofing | Remove existing roof & replace rot S/A Anchordeck underlayment install 26GA me... |
| 2026-08-07 | DM-2608-2662 | 17481 NW 38th AVE | Demolition | Rebuild Florida: Demolishing existing home |
| 2026-08-06 | RR-2608-2647 | 1790 SW 2nd WAY | Renovation | Replace windows in existing openings with Impact windows. |
Query Okeechobee County, Florida permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search Okeechobee County permits issued in the last 30 days curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Okeechobee%20County&state=FL&issued_after=2026-09-06"
The official record sets behind this page, with the date each one's data runs through.
| Record set | Source | Permits | Data through | Note |
|---|---|---|---|---|
| Permits | EnerGov permit portal | 113,955 | 2026-08-08 | Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped. |
Related coverage in Florida and nationwide.
We ingest Okeechobee County's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.
The newest permit we hold for Okeechobee County, Florida is dated August 8, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.
Yes — search Okeechobee County permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.
The median time from permit filing to issuance in Okeechobee County, Florida is 25 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key