PermitStack indexes 50,038 building permits on record in Palm Beach Gardens, Florida, with 11,492 filed or issued in the last 12 months alone. Search by address, contractor, category, and date via our free REST API.
Most common permit types filed or issued in the last year.
Drill into the most common permit categories in Palm Beach Gardens.
The most active contractors by permit volume in Palm Beach Gardens, with a profile of each one's permit history. Counts are permits we hold for Palm Beach Gardens.
Permit activity for individual ZIP codes in Palm Beach Gardens, newest first by volume.
Search held permit records for a Palm Beach Gardens address through /v1/property/history, subject to source coverage, address matching, pagination and plan history limits. Dates and contractor fields may be missing; permit-date signals do not establish installation or current condition. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.
The 10 most recent held permits filed or issued in Palm Beach Gardens, Florida, by issue date where the source publishes one and filing date otherwise. Search held records via the REST API within plan and pagination limits.
| Date | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-09-10 | BSUBP-26-09-1869 | 9540 GREY FLOCK DR | Plumbing | LOT 147 PLAN 508 COASTAL |
| 2026-09-10 | BSUBP-26-09-1866 | 10077 CLOUD VW | Plumbing | LOT 455 PLAN 626 MODERN |
| 2026-09-10 | BSUBE-26-09-2922 | 114 EMERALD KEY LN | Electrical | Electrical as per plans |
| 2026-09-10 | BSUBE-26-09-2926 | 13004 FEATHERING WAY | Electrical | ***Use of Private Provider for Plan Review & Inspections*** Installing new swi... |
| 2026-09-10 | BSUBP-26-09-1868 | 9867 RISING WING ST | Plumbing | LOT 160 PLAN 509 MODERN |
| 2026-09-10 | BSUBP-26-09-1867 | 9519 GREY FLOCK DR | Plumbing | LOT 259 PLAN 509 CONTEMPORARY |
| 2026-09-10 | BSUBR-26-09-0936 | 13209 RIDGEWATER CIR | Roofing | NEW ROOF PER PLANS |
| 2026-09-10 | RMECH-26-09-00407 | 374 PRESTWICK CIR | HVAC | A/C Change Out |
| 2026-09-10 (filed) | RRENO-26-09-00915 | 112 VIA FLORENZA | Renovation | Installation of Accordion Shutters and Clear Panels. Total of 12 and 2 clear panel... |
| 2026-09-10 (filed) | RPOOL-26-09-00184 | 14011 BASTILLE ST | Pool | POOL 12'X24', 6,823 GALS, AND PAVERS SET ON SAND |
Query a page of held Palm Beach Gardens, Florida permit records. Address, category, status, dates and description depend on the source and may be missing or unknown.
# Search Palm Beach Gardens permits filed or issued in the last 30 days curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Palm%20Beach%20Gardens&state=FL&date_after=2026-10-22"
The official record sets behind this page, with data-through dates where measured; missing dates remain unknown.
| Record set | Source | Permits | Data through | Note |
|---|---|---|---|---|
| Permits | EnerGov permit portal | 50,038 | 2026-09-10 | Upstream access blocked since 2026-09-30 (52d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped. |
Related coverage in Florida and nationwide.
We ingest Palm Beach Gardens's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.
The newest permit we hold for Palm Beach Gardens, Florida is dated September 10, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-09-30 (52d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.
You need a free account, which needs no credit card. With it you can search Palm Beach Gardens permits in the browser or call the API (100 requests per day; the free plan covers the last 30 days of permits).
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) attempt delivery of eligible matching records after ingestion. Source delays, matching windows, backlog, retries and endpoint availability affect arrival.
The median time from permit filing to issuance in Palm Beach Gardens, Florida is 2 days, based on permits issued in the last 12 months. This is an aggregate of held records with both dates, not a forecast for a new application. Timing can vary by project scope, review requirements and source coverage.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key