Skip to content
DatasetsBuilding permitsContractor licencesCertificates of occupancyBuilding inspectionsCode violations and complaintsDevelopment pipelineCoverage & freshnessDatasets overview
ProductsAPIWeb searchEnterprise exportsAlerts & webhooksProperty historyAI connector (MCP)
SolutionsInsuranceLenders & CREReal estateRoofingHVACSolarContractors
PricingDocs
ResourcesBlogCompareGlossaryMethodologyStatus
Sign inGet free API key
Florida

Port Orange, Florida Building Permit Search

Access 29,369 building permits on record in Port Orange, Florida through a single REST API, normalized into a consistent schema. Data through November 13, 2026.

29,369
Total permits
6,077
Last 12 months
551
Last 30 days
+22%
Vs same period prior year
Nov 13, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types filed or issued in the last year.

Renovation
1,442
HVAC
953
Roofing
908
Plumbing
312
Fence
290
Electrical
244
New construction
159
Pool
137
Interior remodel
115
Demolition
94

Permit data by trade in Port Orange

Drill into the most common permit categories in Port Orange.

Top contractors in Port Orange

The most active contractors by permit volume in Port Orange, with a profile of each one's permit history. Counts are permits we hold for Port Orange.

Permits by ZIP code in Port Orange

Permit activity for individual ZIP codes in Port Orange, newest first by volume.

Property history for Port Orange

Search held permit records for a Port Orange address through /v1/property/history, subject to source coverage, address matching, pagination and plan history limits. Dates and contractor fields may be missing; permit-date signals do not establish installation or current condition. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent held permits filed or issued in Port Orange, Florida, by issue date where the source publishes one and filing date otherwise. Search held records via the REST API within plan and pagination limits.

DatePermit #AddressCategoryDescription
2026-11-13 (filed)BP2026-000055055811 ANTIGUA DROtherStorage
2026-11-13 (filed)BP2026-00005508960 OLD SUGAR MILL RDRenovationremove and replace existing garage door
2026-11-13 (filed)BP2026-000055021389 N DEXTER DRRoofingcomplete reroof
2026-11-13 (filed)BP2026-000055003326 S PENINSULA DROtherMeter Main
2026-11-13 (filed)BP2026-00005504240 ORCHARD STOtherInstall new Hardie Board Plank Siding over existing T1-11 plywood siding on select...
2026-11-13 (filed)BP2026-000055065463 CRANE FEATHER DRRenovationInstall approx. 24lnft of screen walls, (6) CWS vinyl windows
2026-11-13 (filed)BP2026-000054995200 SYDNEY STOtherremove one tree
2026-11-13 (filed)BP2026-000054986509 HIGHFIELD VILLAGE DROtherSingle Family Residence
2026-11-13 (filed)BP2026-0000549716 PINE IN THE WOOD #PW16HVACHVAC change out 3 ton 13.4 seer2 package unit
2026-11-13 (filed)BP2026-00005509104 MAGNOLIA LOOPRenovationRemove and replace Asphalt shingles and 4 Sq of Flat roofs

Access Port Orange permit data via API

Query a page of held Port Orange, Florida permit records. Address, category, status, dates and description depend on the source and may be missing or unknown.

# Search Port Orange permits filed or issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Port%20Orange&state=FL&date_after=2026-10-16"

Sources for Port Orange

The official record sets behind this page, with data-through dates where measured; missing dates remain unknown.

Record setSourcePermitsData throughNote
Permitspermit portal29,3692026-11-13

Other cities we cover

Related coverage in Florida and nationwide.

FAQ

Where does PermitStack get Port Orange permit data?

We ingest Port Orange's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Port Orange data?

The newest permit we hold for Port Orange, Florida is dated November 13, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.

Can I access Port Orange permits without an API key?

You need a free account, which needs no credit card. With it you can search Port Orange permits in the browser or call the API (100 requests per day; the free plan covers the last 30 days of permits).

Can I export Port Orange permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) attempt delivery of eligible matching records after ingestion. Source delays, matching windows, backlog, retries and endpoint availability affect arrival.

How long does a Port Orange building permit take to issue?

The median time from permit filing to issuance in Port Orange, Florida is 5 days, based on permits issued in the last 12 months. This is an aggregate of held records with both dates, not a forecast for a new application. Timing can vary by project scope, review requirements and source coverage.

Get Port Orange permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key