PermitStack indexes 52,511 building permits issued in Atlanta, Georgia, with 23,740 issued in the last 12 months alone. Search by address, contractor, category, and date via our free REST API.
Most common permit types issued in the last year.
Drill into the most common permit categories in Atlanta.
Most active contractors by permit volume in Atlanta.
The 10 most recent permits issued in Atlanta, Georgia. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-21 | BE-202605831 | 2522 ALSTON DR SE | Electrical | Electrical work will involve touching electrical feeders. Building Permit PV-20260... |
| 2026-08-21 | BM-202604043 | 311 PROSPECT ST NE | HVAC | replace heat pump |
| 2026-08-21 | BT-202601774 | 2819 TUPELO ST SE | Electrical | Temporary Power |
| 2026-08-21 | BB-202607345 | 723 PONCE DE LEON CT NE | Addition | Repair existing driveway and existing retaining wall in kind |
| 2026-08-21 | BP-202603340 | 1946 PINEDALE DR NW | Plumbing | Installation of Water and Sewer |
| 2026-08-21 | BB-202607369 | 2135 LA DAWN LN NW | Demolition | 1. Standard 4-Foot Picket Fencing (Segments B, C, F, G, H, I, K, M)Height & St... |
| 2026-08-21 | BB-202607346 | 239 LOWRY ST NE, UNIT B | Plumbing | SCOPE OF WORK: Storm Drain(1). Cut concrete to locate existing pipe.(2). Excavate... |
| 2026-08-21 | BE-202605825 | 1330 ELIZABETH AVE SW | Electrical | New Construction Home |
| 2026-08-21 | BM-202604037 | 3429 HABERSHAM RD NW | HVAC | replace HVAC system |
| 2026-08-21 | BP-202603343 | 3049 DELMAR LN NW | Plumbing | Rough in plumbing and set out fixtures |
Query Atlanta, Georgia permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Atlanta permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Atlanta&state=GA&issued_after=2026-04-01"
Related coverage in Georgia and nationwide.
We ingest data directly from the official Atlanta open data portal (ArcGIS Hub) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Atlanta, Georgia was issued on August 21, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Atlanta permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
Most Atlanta permits are issued on the same day they are filed, reflecting electronic submission and same-day processing for routine permit types. Larger or more complex projects (new construction, major additions) often take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key