Skip to content
Products API & Data Search Coverage Property History Alerts For Contractors Data Exports
Solutions Solar & Energy Roofing HVAC Real Estate Insurance Lenders & CRE Contractors
Pricing Refer & Earn API Docs Sign In Get Started
Illinois

Rock Island, Illinois Building Permit Search

Access 834 building permits issued in Rock Island, Illinois through a single REST API, normalized into a consistent schema. Data through August 10, 2026.

834
Total permits
834
Last 12 months
0
Last 30 days
—
vs same period prior year
Aug 10, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Plumbing
186
Interior remodel
119
Roofing
114
Mechanical
102
Electrical
93
HVAC
57
Signage
18
Demolition
16
Pool
11
New construction
10

Permit data by trade in Rock Island

Drill into the most common permit categories in Rock Island.

Top contractors in Rock Island

The most active contractors by permit volume in Rock Island, with a profile of each one's permit history. Counts are permits we hold for Rock Island.

Property history for Rock Island

Every permit we hold for one Rock Island address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent permits issued in Rock Island, Illinois. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-08-10PLMB-2026-00192714 13TH AVPlumbingReplace copper with pex
2026-08-10PLMB-2026-001901523 14TH 1/2 STPlumbingInstall fixtures
2026-08-10PLMB-2026-00191917 4TH AVPlumbingInstall fixtures
2026-08-07BLDR-2026002684112 27TH AVInterior remodel725AB6040
2026-08-07BLDR-2026002623709 30TH STRoofingErie to remove existing roofing and properly dispose. Erie to furnish and install
2026-08-07PLMB-2026-001892031 31ST STPlumbingSanitary Sewer Repair
2026-08-07BLDR-202600263917 4TH AVInterior remodelwindows installation, exterior door
2026-08-07PLMB-2026-001883233 17TH AVPlumbingsewer lateral repair from house to main in street. Applying for ROW permit also.
2026-08-07BLDR-2026002693231 36TH 1/2 AVInterior remodelReplace wood siding with 17 sq vinyl siding. Including soffit & fascia
2026-08-06MECH-2026-001563701 24TH STHVAC60,000 BTU Furnace and 2 TON AC Replacement

Access Rock Island permit data via API

Query Rock Island, Illinois permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search Rock Island permits issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Rock%20Island&state=IL&issued_after=2026-09-06"

Sources for Rock Island

The official record sets behind this page, with the date each one's data runs through.

Record setSourcePermitsData throughNote
PermitsEnerGov permit portal8342026-08-10Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Other cities we cover

Related coverage in Illinois and nationwide.

FAQ

Where does PermitStack get Rock Island permit data?

We ingest Rock Island's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Rock Island data?

The newest permit we hold for Rock Island, Illinois is dated August 10, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Can I access Rock Island permits without an API key?

Yes — search Rock Island permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).

Can I export Rock Island permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.

How long does a Rock Island building permit take to issue?

The median time from permit filing to issuance in Rock Island, Illinois is 2 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Rock Island permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key