Access 5,243 building permits issued in Leawood, Kansas through a single REST API. Refreshed daily from the official Leawood open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
The 10 most recent permits issued in Leawood, Kansas. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-04 | BD-001948-2026 | 12707 PEMBROKE LN | Plumbing | REPIPE HOUSE - 1 1/4" Trunk Line (Black Pipe, up to 4 appliances-max.) due to... |
| 2026-06-02 | BD-001877-2026 | 4813 W 143RD TER | Roofing | DaVinci shake and ridge tiles roof installation |
| 2026-05-29 | BD-001795-2026 | 3510 W 102ND ST | Roofing | Tear off and install roof with Tamko Titan XT shingles |
| 2026-05-28 | Appeal-001748-2026 | 2015 W 81ST TER | Fence | Fence Height Exception |
| 2026-05-21 | BD-001269-2026 | 3708 W 153RD ST | Addition | Pergola addition on top of replaced backyard deck (BD-001876-2025). Pergola is con... |
| 2026-05-20 | BD-001740-2026 | 2948 W 118TH TER | Other | Remove exterior window and match stucco siding - construction shall meet 2018 IRC |
| 2026-05-05 | BD-001351-2026 | 11412 CANTERBURY CIR | Solar | Reroof with new decking and underlayment installation |
| 2026-05-04 | BD-001189-2026 | 2015 W 81ST TER | Renovation | Replace a 3 tier deck to same footprint. Framing plan may modify after excavation... |
| 2026-04-28 | BD-001202-2026 | 2016 W 96TH ST | Solar | Rooftop solar system battery energy storage installation |
| 2026-04-20 | BD-000821-2026 | 2017 W 95TH ST | Roofing | Front portico addition with matching roof shingles |
Query Leawood, Kansas permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Leawood permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Leawood&state=KS&issued_after=2026-04-01"
Related coverage in Kansas and nationwide.
We ingest data directly from the official Leawood open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Leawood, Kansas was issued on June 7, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Leawood permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Leawood, Kansas is 8 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key