Access 25,584 building permits on record in Bossier City, Louisiana through a single REST API, normalized into a consistent schema. Data through November 20, 2026.
Most common permit types filed or issued in the last year.
Drill into the most common permit categories in Bossier City.
The most active contractors by permit volume in Bossier City, with a profile of each one's permit history. Counts are permits we hold for Bossier City.
Permit activity for individual ZIP codes in Bossier City, newest first by volume.
Search held permit records for a Bossier City address through /v1/property/history, subject to source coverage, address matching, pagination and plan history limits. Dates and contractor fields may be missing; permit-date signals do not establish installation or current condition. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.
The 10 most recent held permits filed or issued in Bossier City, Louisiana, by issue date where the source publishes one and filing date otherwise. Search held records via the REST API within plan and pagination limits.
| Date | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-11-20 (filed) | RMECH-005809-2026 | 236 Boathouse | Mechanical | New Construction |
| 2026-11-20 (filed) | RMECH-005806-2026 | 230 Boathouse | Mechanical | New Construction |
| 2026-11-20 (filed) | RMECH-005814-2026 | 3310 Industrial Dr | HVAC | HVAC Changeout |
| 2026-11-20 (filed) | RMECH-005810-2026 | 238 Boathouse | Mechanical | New Construction |
| 2026-11-20 (filed) | RMECH-005808-2026 | 234 Boathouse | Mechanical | New Construction |
| 2026-11-20 (filed) | RMECH-005807-2026 | 232 Boathouse | Mechanical | New Construction |
| 2026-11-20 (filed) | RBLDR-005820-2026 | 1421 Gibson | Interior remodel | Alteration, Remodel, Repair |
| 2026-11-20 (filed) | CBLDG-005818-2026 | 207 Texas | Addition | Addition |
| 2026-11-20 (filed) | RMECH-005811-2026 | 240 Boathouse | Mechanical | New Construction |
| 2026-11-20 (filed) | RMECH-005805-2026 | 228 Boathouse | Mechanical | New Construction |
Query a page of held Bossier City, Louisiana permit records. Address, category, status, dates and description depend on the source and may be missing or unknown.
# Search Bossier City permits filed or issued in the last 30 days curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Bossier%20City&state=LA&date_after=2026-10-22"
The official record sets behind this page, with data-through dates where measured; missing dates remain unknown.
| Record set | Source | Permits | Data through | Note |
|---|---|---|---|---|
| Permits | EnerGov permit portal | 25,584 | 2026-11-20 |
Related coverage in Louisiana and nationwide.
We ingest Bossier City's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.
The newest permit we hold for Bossier City, Louisiana is dated November 20, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.
You need a free account, which needs no credit card. With it you can search Bossier City permits in the browser or call the API (100 requests per day; the free plan covers the last 30 days of permits).
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) attempt delivery of eligible matching records after ingestion. Source delays, matching windows, backlog, retries and endpoint availability affect arrival.
The median time from permit filing to issuance in Bossier City, Louisiana is 1 day, based on permits issued in the last 12 months. This is an aggregate of held records with both dates, not a forecast for a new application. Timing can vary by project scope, review requirements and source coverage.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key