Access 53,190 building permits issued in Hingham, Massachusetts through a single REST API, normalized into a consistent schema. Data through October 15, 2026.
Most common permit types issued in the last year.
Drill into the most common permit categories in Hingham.
Permit activity for individual ZIP codes in Hingham, newest first by volume.
Every permit we hold for one Hingham address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.
The 10 most recent permits issued in Hingham, Massachusetts. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-10-15 | E-26-0729 | 8 kilby street | Electrical | install sub panel in garage w... |
| 2026-10-15 | E-26-0728 | 114 derby street | Fire alarm | replacing fire alarm control p... |
| 2026-10-15 | E-26-0727 | 5 crowes lane | Electrical | grounding foundation for aditi... |
| 2026-10-15 | R-26-1001 | 34 butler road | Renovation | strip and replace rear dormer ... |
| 2026-10-14 | P-26-0480 | 25 clubhouse drive | Plumbing | replace fixtures in bathroom |
| 2026-10-14 | R-26-0995 | 29 franklin rodgers rd | Demolition | demo existing deck and rebuild... |
| 2026-10-14 | E-26-0726 | 145 martins lane | Electrical | this project some electrician ... |
| 2026-10-14 | G-26-0341 | 25 shipyard drive | Other | gas piping to fixtures at futu... |
| 2026-10-14 | R-26-0997 | 16 liberty road | Addition | proposed second story addition... |
| 2026-10-14 | P-26-0481 | 43 burditt avenue | Plumbing | water filtration system |
Query Hingham, Massachusetts permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search Hingham permits issued in the last 30 days curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Hingham&state=MA&issued_after=2026-09-23"
The official record sets behind this page, with the date each one's data runs through.
| Record set | Source | Permits | Data through | Note |
|---|---|---|---|---|
| Permits | permit portal | 53,190 | 2026-10-15 |
Related coverage in Massachusetts and nationwide.
We ingest Hingham's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.
The newest permit we hold for Hingham, Massachusetts is dated October 15, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.
Yes — search Hingham permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.
The median time from permit filing to issuance in Hingham, Massachusetts is 5 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key