Access 103,293 building permits on record in Portland, Maine through a single REST API, normalized into a consistent schema. Data through November 20, 2026.
Most common permit types filed or issued in the last year.
Drill into the most common permit categories in Portland.
The most active contractors by permit volume in Portland, with a profile of each one's permit history. Counts are permits we hold for Portland.
Permit activity for individual ZIP codes in Portland, newest first by volume.
Search held permit records for a Portland address through /v1/property/history, subject to source coverage, address matching, pagination and plan history limits. Dates and contractor fields may be missing; permit-date signals do not establish installation or current condition. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.
The 10 most recent held permits filed or issued in Portland, Maine, by issue date where the source publishes one and filing date otherwise. Search held records via the REST API within plan and pagination limits.
| Date | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-11-20 (filed) | PLUMB2026-04241 | 1725 FOREST AVE | Plumbing | Drain and disconnect the existing gas water heater and install a Rheem water heate... |
| 2026-11-20 | ELEC2026-14432 | 25 DOVER AVE | Solar | Installation of solar system; (22) roof mounted solar panels and microinverters |
| 2026-11-20 | PLUMB2026-04242 | 901 WASHINGTON AVE | Plumbing | Behavioral Health medical office space |
| 2026-11-20 (filed) | HVAC2026-04873 | 40 FALL LN | HVAC | Pellet stove installed |
| 2026-11-20 (filed) | BLDC2026-05576 | 57 CUMBERLAND AVE | Interior remodel | Deck extension |
| 2026-11-20 (filed) | BLDC2026-05575 | 15 FRANKLIN ST | Interior remodel | Renovation of the first floor office space expanding into the former Maine Title o... |
| 2026-11-20 (filed) | BLDC2026-05574 | 22 BRAMHALL ST | Interior remodel | Upgrades to (3) Interventional Radiology Rooms on the basement level at MMC. Upgra... |
| 2026-11-20 (filed) | ELEC2026-14431 | 235 PLEASANT AVE | Electrical | Rewire house with 200 amp service |
| 2026-11-20 (filed) | ELEC2026-14433 | 186 MAINE AVE | HVAC | Sub permit to HVAC |
| 2026-11-20 (filed) | FIRE2026-02478 | 144 FORE ST | Interior remodel | Renovation to existing pipe schedule system. Using no-calc flex heads to replace e... |
Query a page of held Portland, Maine permit records. Address, category, status, dates and description depend on the source and may be missing or unknown.
# Search Portland permits filed or issued in the last 30 days curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Portland%20%28ME%29&state=ME&date_after=2026-10-22"
The official record sets behind this page, with data-through dates where measured; missing dates remain unknown.
| Record set | Source | Permits | Data through | Note |
|---|---|---|---|---|
| ME | EnerGov permit portal | 103,293 | 2026-11-20 |
Related coverage in Maine and nationwide.
We ingest Portland's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.
The newest permit we hold for Portland, Maine is dated November 20, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.
You need a free account, which needs no credit card. With it you can search Portland permits in the browser or call the API (100 requests per day; the free plan covers the last 30 days of permits).
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) attempt delivery of eligible matching records after ingestion. Source delays, matching windows, backlog, retries and endpoint availability affect arrival.
The median time from permit filing to issuance in Portland, Maine is 1 day, based on permits issued in the last 12 months. This is an aggregate of held records with both dates, not a forecast for a new application. Timing can vary by project scope, review requirements and source coverage.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key