Access 101,401 building permits issued in Mankato, Minnesota through a single REST API. Refreshed daily from the official Mankato open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Mankato.
The 10 most recent permits issued in Mankato, Minnesota. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-20 | BLDR-0561-26 | 208 ESSEX 9853 | Other | Taking down old 12' by 14' deck and replacing with new 12' by 14' ... |
| 2026-06-19 | BLDR-0560-26 | 120 TILE 2415 | Fence | Repaired and replaced the existing fence between my property and the neighbors pro... |
| 2026-06-19 | LIMEP-0016-26 | — | Other | replacing a deteriorated power pole and equipment Xcel WO 115430636 |
| 2026-06-19 | LIMEP-0015-26 | 57090 DEERHAVEN 24420 | Other | replacing a deteriorated power pole and equipment |
| 2026-06-19 | PLMC-0074-26 | 1831 PREMIER 143972 | Plumbing | install 1 rpz, 2 meters, 1 softener, 1 water heater, 2 hose bibs, 2 drinking fount... |
| 2026-06-19 | SIGN-0147-26 | 600 RIVERFRONT 142726 | Signage | Avera Method |
| 2026-06-19 | MECR-0260-26 | 725 TRANQUILITY 151037 | HVAC | New Residential HVAC Installation |
| 2026-06-19 | LIMEP-0017-26 | 23955 LIME VALLEY 24178 | Other | replacing a deteriorated power pole and equipment |
| 2026-06-19 | MECR-0262-26 | 2318 HOFFMAN 17310 | HVAC | replace furnace and ac |
| 2026-06-19 | LIMEP-0014-26 | 23334 LIME VALLEY 102357 | Other | replacing a deteriorated power pole and equipment |
Query Mankato, Minnesota permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Mankato permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Mankato&state=MN&issued_after=2026-04-01"
Related coverage in Minnesota and nationwide.
We ingest data directly from the official Mankato open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Mankato, Minnesota was issued on June 20, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Mankato permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Mankato, Minnesota is 1 day, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key