Skip to content
Products API & Data Search Coverage Property History Alerts For Contractors Data Exports
Solutions Solar & Energy Roofing HVAC Real Estate Insurance Lenders & CRE Contractors
Pricing Refer & Earn API Docs Sign In Get Started
Minnesota

Savage, Minnesota Building Permit Search

Access 35,471 building permits issued in Savage, Minnesota through a single REST API, normalized into a consistent schema. Data through October 21, 2026.

35,471
Total permits
2,338
Last 12 months
192
Last 30 days
-13%
vs same period prior year
Oct 21, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Plumbing
852
HVAC
432
Renovation
244
Roofing
219
Interior remodel
178
Signage
50
Mechanical
40
Addition
15
Demolition
11
Pool
9

Permit data by trade in Savage

Drill into the most common permit categories in Savage.

Top contractors in Savage

The most active contractors by permit volume in Savage, with a profile of each one's permit history. Counts are permits we hold for Savage.

Permits by ZIP code in Savage

Permit activity for individual ZIP codes in Savage, newest first by volume.

Property history for Savage

Every permit we hold for one Savage address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent permits issued in Savage, Minnesota. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-10-20SA0409705350 135 St WRenovationDetached Garage
2026-10-20SA04100113541 Quebec Ave SInterior remodelBathroom Remodel: Turning half bath into full bath. New layout, more details on pr...
2026-10-19SA04079015721 Wyoming AveAdditionScreened Porch
2026-10-19SA0405254707 124 St WInterior remodelRepair the existing dwelling to bring it up to code
2026-10-15SA04060915800 Aquila AveNew constructionDetached
2026-10-13SA0405165478 Egan DrFoundationreplace foundation blocks on front of garage
2026-10-13SA0405185482 Egan DrFoundationreplace concrete blocks in front of garage and on garage side walls
2026-10-13SA0405175302 Egan DrFoundationconcrete blocks on front of garage and garage side walls
2026-10-13SA04083714596 Yosemite Ave SPlumbingInstall drain tile & sump pump
2026-10-12SA04089813730 Inglewood Ave SInterior remodelSecond floor tub to tub replacement

Access Savage permit data via API

Query Savage, Minnesota permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search Savage permits issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Savage&state=MN&issued_after=2026-09-23"

Sources for Savage

The official record sets behind this page, with the date each one's data runs through.

Record setSourcePermitsData throughNote
Permitspermit portal35,4712026-10-21

Other cities we cover

Related coverage in Minnesota and nationwide.

FAQ

Where does PermitStack get Savage permit data?

We ingest Savage's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Savage data?

The newest permit we hold for Savage, Minnesota is dated October 21, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.

Can I access Savage permits without an API key?

Yes — search Savage permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).

Can I export Savage permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.

How long does a Savage building permit take to issue?

Most Savage permits are issued on the same day they are filed, reflecting electronic submission and same-day processing for routine permit types. Larger or more complex projects (new construction, major additions) often take longer.

Get Savage permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key