Skip to content
DatasetsBuilding permitsContractor licencesCertificates of occupancyBuilding inspectionsCode violations and complaintsDevelopment pipelineCoverage & freshnessDatasets overview
ProductsAPIWeb searchEnterprise exportsAlerts & webhooksProperty historyAI connector (MCP)
SolutionsInsuranceLenders & CREReal estateRoofingHVACSolarContractors
PricingDocs
ResourcesBlogCompareGlossaryMethodologyStatus
Sign inGet free API key
North Carolina

Asheville, North Carolina Building Permit Search

Access 66,605 building permits on record in Asheville, North Carolina through a single REST API, normalized into a consistent schema. Data through November 20, 2026.

66,605
Total permits
3,662
Last 12 months
242
Last 30 days
-28%
Vs same period prior year
Nov 20, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types filed or issued in the last year.

Electrical
536
Demolition
374
Interior remodel
373
HVAC
329
Signage
229
New construction
201
Plumbing
183
Roofing
176
Renovation
158
Solar
105

Permit data by trade in Asheville

Drill into the most common permit categories in Asheville.

Permits by ZIP code in Asheville

Permit activity for individual ZIP codes in Asheville, newest first by volume.

Property history for Asheville

Search held permit records for a Asheville address through /v1/property/history, subject to source coverage, address matching, pagination and plan history limits. Dates and contractor fields may be missing; permit-date signals do not establish installation or current condition. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent held permits filed or issued in Asheville, North Carolina, by issue date where the source publishes one and filing date otherwise. Search held records via the REST API within plan and pagination limits.

DatePermit #AddressCategoryDescription
2026-11-20 (filed)26-084261 N PACK SQ, ASHEVILLE, NC 28801SignageINSTALLING NEW NON ILLUMINATED LETTERING SIGN ON BUILDING FOR BILTMORE CORPORATE O...
2026-11-20 (filed)26-084161 EVELYN PL, #1/2, ASHEVILLE, NC 28801ElectricalPOOL HOUSE REMODEL. CONVERT STORAGE AREA OF EXISTING POOL HOUSE TO A GYM AND LAUND...
2026-11-20 (filed)26-084251 EVELYN PL, #1/2, ASHEVILLE, NC 28801ElectricalPOOL HOUSE REMODEL. CONVERT STORAGE AREA OF EXISTING POOL HOUSE TO A GYM AND LAUND...
2026-11-20 (filed)26-08420147 REED ST, ASHEVILLE, NC 28803RenovationAN EXISTING 200-SQUARE-FOOT DECK WILL BE REMOVED. A NEW 1,000-SQUARE-FOOT, TWO-STO...
2026-11-20 (filed)26-08399172 WEMBLEY RD, ASHEVILLE, NC 28804ElectricalMoved overhead service to underground service, moved meter base to back of house a...
2026-11-20 (filed)26-0841928 N SPRUCE ST, ASHEVILLE, NC 28801ElectricalCOMMERCIAL REP-REP FOR OWNER IMPROVEMENTS SHERWOOD HILL LLC; NOT FOR OCCUPANCY; AD...
2026-11-20 (filed)26-0839865 BURTON ST, ASHEVILLE, NC 28806OtherREMOVE ONE NCDOT PERMITTED WOODEN POLE LAMAR BILLBOARD ON PARCEL 9638457461000000 ...
2026-11-19 (filed)26-0838531 WILBURN PL, ASHEVILLE, NC 28806ElectricalCONSTRUCTION OF (2) NEW COVERED PORCHES BUILT (1) WITH A SCREEN NO ELECTRICAL.
2026-11-19 (filed)26-0837621 BALSAM AVE, ASHEVILLE, NC 28806ElectricalPLACEMENT OF 10' X 16' SHED. INSTALL ELECTRICAL FOR OUTLETS AND LIGHTING P...
2026-11-19 (filed)26-0838623 TURTLE CREEK DR, ASHEVILLE, NC 28803SignageINSTALLATION OF NEW ILLUMINATED SIGN ON BUILDING FOR ADVENT HEALTH

Access Asheville permit data via API

Query a page of held Asheville, North Carolina permit records. Address, category, status, dates and description depend on the source and may be missing or unknown.

# Search Asheville permits filed or issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Asheville&state=NC&date_after=2026-10-22"

Sources for Asheville

The official record sets behind this page, with data-through dates where measured; missing dates remain unknown.

Record setSourcePermitsData throughNote
Permitsopen data (ArcGIS)66,6052026-11-20

Other cities we cover

Related coverage in North Carolina and nationwide.

FAQ

Where does PermitStack get Asheville permit data?

We ingest Asheville's official permit records directly from ArcGIS Hub and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Asheville data?

The newest permit we hold for Asheville, North Carolina is dated November 20, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.

Can I access Asheville permits without an API key?

You need a free account, which needs no credit card. With it you can search Asheville permits in the browser or call the API (100 requests per day; the free plan covers the last 30 days of permits).

Can I export Asheville permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) attempt delivery of eligible matching records after ingestion. Source delays, matching windows, backlog, retries and endpoint availability affect arrival.

Get Asheville permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key