Skip to content
Products API & Data Search Coverage Property History Alerts For Contractors Data Exports
Solutions Solar & Energy Roofing HVAC Real Estate Insurance Lenders & CRE Contractors
Pricing Refer & Earn API Docs Sign In Get Started
Nebraska

Lincoln, Nebraska Building Permit Search

Access 8,494 building permits issued in Lincoln, Nebraska through a single REST API, normalized into a consistent schema. Data through October 2, 2026.

8,494
Total permits
1,822
Last 12 months
1,250
Last 30 days
—
vs same period prior year
Oct 2, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Plumbing
487
New construction
482
Mechanical
268
Electrical
228
Signage
53
Renovation
43
Fire alarm
26
Interior remodel
22
Roofing
11
Grading
7

Permit data by trade in Lincoln

Drill into the most common permit categories in Lincoln.

Top contractors in Lincoln

The most active contractors by permit volume in Lincoln, with a profile of each one's permit history. Counts are permits we hold for Lincoln.

Property history for Lincoln

Every permit we hold for one Lincoln address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent permits issued in Lincoln, Nebraska. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-10-02E26042286039 FRANKLIN STElectricalInstall 200 amp Main circuit breaker panel and underground meter. Overhead 60 amp ...
2026-10-02P26084805725 HARTLEY STPlumbingGAS METER REPLACEMENT
2026-10-02P26085016800 A STPlumbingElectric Water Heater Apt #124
2026-10-02S26005565601 S 48TH STSignageSONIC #2410 LINCOLNUSING EXISTING POLE AND ADDING A STUD POLE AND NEW LED SIGN CAB...
2026-10-02P26084835710 HARTLEY STPlumbingGAS METER REPLACEMENT
2026-10-02P26084795720 HARTLEY STPlumbingGAS METER REPLACEMENT
2026-10-02E26042311821 N STElectricalWIRED NEW ON-DEMAND WATER HEATER.
2026-10-02E260423510720 CENTURY LNElectricalNew house wiring with 320a service
2026-10-02S26005622756 O STSignageRemove existing panel 84" x 130" - replace with new Di-Bond panels.Panel...
2026-10-02P26085065021 VINE STPlumbing5021 Vine #708replace water heater

Access Lincoln permit data via API

Query Lincoln, Nebraska permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search Lincoln permits issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?jurisdiction=Lincoln&state=NE&issued_after=2026-09-06"

Sources for Lincoln

The official record sets behind this page, with the date each one's data runs through.

Record setSourcePermitsData throughNote
Building permitsopen data (ArcGIS)7,2442026-05-29The source is not currently publishing new records.
Building permitsAccela Citizen Access portal1,2502026-10-02

Other cities we cover

Related coverage in Nebraska and nationwide.

FAQ

Where does PermitStack get Lincoln permit data?

We ingest Lincoln's official permit records directly from 2 official record sets, each listed under Sources on this page and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Lincoln data?

The newest permit we hold for Lincoln, Nebraska is dated October 2, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.

Can I access Lincoln permits without an API key?

Yes — search Lincoln permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).

Can I export Lincoln permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.

How long does a Lincoln building permit take to issue?

The median time from permit filing to issuance in Lincoln, Nebraska is 12 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Lincoln permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key