Access 12,878 building permits issued in Ashland, Oregon through a single REST API. Refreshed daily from the official Ashland open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Ashland.
Most active contractors by permit volume in Ashland.
The 10 most recent permits issued in Ashland, Oregon. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-07 | PWP-2026-04414 | 181 MORSE AV | Renovation | REPAIR OF A LEAK ON GAS MAIN/ VALVE ON MORSE, LEAK CAME IN AS "162 MORSE"... |
| 2026-08-07 | PWP-2026-04411 | 815 OAK ST | Renovation | 815 Oak St Gas Service Replacement 8/13-8/24 |
| 2026-08-07 | PWP-2026-04419 | 77 N MOUNTAIN AV | Plumbing | 77 N Mountain Ave CCTV Sewer Line Scope Inspection 8/10-10/11 |
| 2026-08-07 | PWP-2026-04416 | 181 MORSE AV | Renovation | REPAIR OF A LEAK ON GAS MAIN/ VALVE ON MORSE, LEAK CAME IN AS "162 MORSE"... |
| 2026-08-07 | PWP-2026-04409 | 815 OAK ST | Renovation | 815 Oak St Gas Service Replacement 8/13-8/24 |
| 2026-08-06 | MECH-2026-03121 | 2890 WEDGEWOOD LN | HVAC | Remove and replace heat pump and air handler. |
| 2026-08-06 | PWP-2026-04406 | 314 W NEVADA ST | Renovation | 314 W Nevada St Gas Service Replacement 8/10-8/24 |
| 2026-08-06 | PWP-2026-04412 | 812 OAK ST | Renovation | 812 Oak St Gas Service Replacement 8/13-8/24 |
| 2026-08-06 | PWP-2026-04417 | 647 BEACH ST | Plumbing | 647 Beach St Sewer Lateral Replacement 8/10-8/17 |
| 2026-08-06 | PLUMB-2026-01327 | 647 BEACH ST | Plumbing | Replacing 4 LF of Orangeburg Pipe with 4” 3034 Pipe. The PVC lateral transitions... |
Query Ashland, Oregon permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Ashland permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Ashland&state=OR&issued_after=2026-04-01"
Related coverage in Oregon and nationwide.
We ingest data directly from the official Ashland open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Ashland, Oregon was issued on August 7, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Ashland permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
Most Ashland permits are issued on the same day they are filed, reflecting electronic submission and same-day processing for routine permit types. Larger or more complex projects (new construction, major additions) often take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key