Access 28,460 building permits on record in Happy Valley, Oregon through a single REST API, normalized into a consistent schema. Data through August 7, 2026.
Most common permit types filed or issued in the last year.
Drill into the most common permit categories in Happy Valley.
Permit activity for individual ZIP codes in Happy Valley, newest first by volume.
Search held permit records for a Happy Valley address through /v1/property/history, subject to source coverage, address matching, pagination and plan history limits. Dates and contractor fields may be missing; permit-date signals do not establish installation or current condition. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.
The 10 most recent held permits filed or issued in Happy Valley, Oregon, by issue date where the source publishes one and filing date otherwise. Search held records via the REST API within plan and pagination limits.
| Date | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-07 (filed) | MECR-0740-2026 | 14814 SE FRYE ST | HVAC | replace gas furnace and air conditioner |
| 2026-08-07 | PLMR-0733-2026 | 12542 SE MT SCOTT BLVD | Plumbing | Remove and replace gas water heater |
| 2026-08-07 (filed) | ROW-0739-2026 | 13454 SE CALLAHAN RD | Other | Install new service at 13454 SE Callahan Rd. Main is on the 11' in ROW. One 5&... |
| 2026-08-06 (filed) | BLDR-0735-2026 | 11030 SE SWEET CREEK PL | New construction | Pleasant Valley Villages Ph 7, Lot 627, 4-Unit Townhome |
| 2026-08-06 (filed) | ROW-0734-2026 | 12600 SE MT SCOTT BLVD | Other | Single day, Short duration traffic control for land surveying measurements of monu... |
| 2026-08-06 (filed) | BLDR-0737-2026 | 11058 SE SWEET CREEK PL | New construction | Pleasant Valley Villages Ph 7, Lot 629, 4-Unit Townhome |
| 2026-08-06 (filed) | BLDR-0736-2026 | 11044 SE SWEET CREEK PL | New construction | Pleasant Valley Villages Ph 7, Lot 628, 4-Unit Townhome |
| 2026-08-06 (filed) | BLDR-0738-2026 | 11072 SE SWEET CREEK PL | New construction | Pleasant Valley Villages Ph 7, Lot 630, 4-Unit Townhome |
| 2026-08-06 (filed) | MECC-0732-2026 | 17005 SE SUNNYSIDE RD | HVAC | New RTU for new TI area, modified and new ductwork for project area. |
| 2026-08-05 | PLMR-0724-2026 | 12314 SE VERLIE ST | Plumbing | Replace water heater; like for like |
Query a page of held Happy Valley, Oregon permit records. Address, category, status, dates and description depend on the source and may be missing or unknown.
# Search Happy Valley permits filed or issued in the last 30 days curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Happy%20Valley&state=OR&date_after=2026-10-22"
The official record sets behind this page, with data-through dates where measured; missing dates remain unknown.
| Record set | Source | Permits | Data through | Note |
|---|---|---|---|---|
| Permits | EnerGov permit portal | 28,460 | 2026-08-07 | Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped. |
Related coverage in Oregon and nationwide.
We ingest Happy Valley's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.
The newest permit we hold for Happy Valley, Oregon is dated August 7, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.
You need a free account, which needs no credit card. With it you can search Happy Valley permits in the browser or call the API (100 requests per day; the free plan covers the last 30 days of permits).
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) attempt delivery of eligible matching records after ingestion. Source delays, matching windows, backlog, retries and endpoint availability affect arrival.
The median time from permit filing to issuance in Happy Valley, Oregon is 8 days, based on permits issued in the last 12 months. This is an aggregate of held records with both dates, not a forecast for a new application. Timing can vary by project scope, review requirements and source coverage.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key