Access 67,506 building permits on record in Oregon City, Oregon through a single REST API, normalized into a consistent schema. Data through November 9, 2026.
Most common permit types filed or issued in the last year.
Drill into the most common permit categories in Oregon City.
Permit activity for individual ZIP codes in Oregon City, newest first by volume.
Search held permit records for a Oregon City address through /v1/property/history, subject to source coverage, address matching, pagination and plan history limits. Dates and contractor fields may be missing; permit-date signals do not establish installation or current condition. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.
The 10 most recent held permits filed or issued in Oregon City, Oregon, by issue date where the source publishes one and filing date otherwise. Search held records via the REST API within plan and pagination limits.
| Date | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-11-09 (filed) | BMECH-26-00313 | 19341 INISHBRIDE CT | HVAC | Residential - Replace gas furnace and air conditioner |
| 2026-11-09 (filed) | RWOBS-26-00031 | 300 3RD ST | Other | Temporary Closure of Singer Falls Stairs for 1.5' Wedding Event Applicant prop... |
| 2026-11-09 (filed) | BELEC-26-00530 | 16278 FRONT AVE | Solar | Residential: Installation of solar panels on existing roof, 6.6KW, with the additi... |
| 2026-11-09 (filed) | BMECH-26-00314 | 300 WARNER ST | HVAC | Residential - Replace Gas Furnace and Install AC |
| 2026-11-09 (filed) | BCOMM-26-00136 | 332 VINE ST | Other | Change in use/occupancy from R-3 to an R-3 license care facility 1-5 beds. |
| 2026-11-09 (filed) | BPLUM-26-00370 | 19341 INISHBRIDE CT | Plumbing | Residential: partial re-pipe of hose bib & shut off valves. approx 30 ft. Chan... |
| 2026-11-09 | BMECH-26-00312 | 19293 WINDMILL DR | HVAC | Residential: Replace furnace and A/C, possible gas line alteration or test. |
| 2026-11-09 | BELEC-26-00527 | 2001 WASHINGTON ST | Electrical | Commercial: (1) Limited Energy: Install new CAT6 cables to approximately 7 outlet ... |
| 2026-11-09 (filed) | BSOLAR-26-00040 | 16278 FRONT AVE | Solar | Residential: Installation of solar panels on existing roof, 6.6KW, with the additi... |
| 2026-11-06 | EC-26-00086 | 807 MAIN ST | Demolition | Commercial, County-Owned: New 73,662 sqft building - 84 unit multi-family 6-story ... |
Query a page of held Oregon City, Oregon permit records. Address, category, status, dates and description depend on the source and may be missing or unknown.
# Search Oregon City permits filed or issued in the last 30 days curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Oregon%20City&state=OR&date_after=2026-10-11"
The official record sets behind this page, with data-through dates where measured; missing dates remain unknown.
| Record set | Source | Permits | Data through | Note |
|---|---|---|---|---|
| Permits | EnerGov permit portal | 67,506 | 2026-11-09 |
Related coverage in Oregon and nationwide.
We ingest Oregon City's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.
The newest permit we hold for Oregon City, Oregon is dated November 9, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.
You need a free account, which needs no credit card. With it you can search Oregon City permits in the browser or call the API (100 requests per day; the free plan covers the last 30 days of permits).
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) attempt delivery of eligible matching records after ingestion. Source delays, matching windows, backlog, retries and endpoint availability affect arrival.
The median time from permit filing to issuance in Oregon City, Oregon is 3 days, based on permits issued in the last 12 months. This is an aggregate of held records with both dates, not a forecast for a new application. Timing can vary by project scope, review requirements and source coverage.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key