Access 219,258 building permits on record in Horry County, South Carolina through a single REST API, normalized into a consistent schema. Data through November 10, 2026.
Most common permit types filed or issued in the last year.
Drill into the most common permit categories in Horry County.
The most active contractors by permit volume in Horry County, with a profile of each one's permit history. Counts are permits we hold for Horry County.
Search held permit records for a Horry County address through /v1/property/history, subject to source coverage, address matching, pagination and plan history limits. Dates and contractor fields may be missing; permit-date signals do not establish installation or current condition. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.
The 10 most recent held permits filed or issued in Horry County, South Carolina, by issue date where the source publishes one and filing date otherwise. Search held records via the REST API within plan and pagination limits.
| Date | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-11-10 | SWP-11-26-227925 | 4470 LONG AVE EXT | Other | Joe D Cox - Lots 1-4 (FC S3) Paper Laura, SW |
| 2026-11-10 (filed) | ELEC-11-26-227932 | - | Electrical | 4- Gang Meter Base Upgrade (81876) North Side |
| 2026-11-10 (filed) | ELEC-11-26-227930 | - | Electrical | 6-Gang Meter Base Upgrade (81965) North Side |
| 2026-11-10 (filed) | ELEC-11-26-227929 | - | Electrical | 6- Gang Meter Base Upgrade (81968- South Side) |
| 2026-11-10 | ELEC-11-26-227649 | 421 CAVERLY LN | Electrical | Service upgrade electrical overhead, going to put underground |
| 2026-11-10 | ELEC-11-26-227689 | 3096 1ST AVE S | Electrical | Service. Upgrade electrical overhead, going to be underground 200AMP |
| 2026-11-10 | ELEC-11-26-227642 | 2352 E HWY 9 | Electrical | cos 200 amp meter and disconnect Horry Electric is making them repair & replac... |
| 2026-11-10 (filed) | ELEC-11-26-227934 | - | Electrical | 4- Gang Meter Base Upgrade (81875) South Side |
| 2026-11-10 | SWP-11-26-227923 | - | Other | Wyatt Wise (Lots 1-8) (FC S1) Paper -- Denice SW ENG |
| 2026-11-10 | SWP-11-26-227919 | - | Other | Home Placer, LLC ( Martini Meadows) FC S3 -- PAPER LAURA |
Query a page of held Horry County, South Carolina permit records. Address, category, status, dates and description depend on the source and may be missing or unknown.
# Search Horry County permits filed or issued in the last 30 days curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Horry%20County&state=SC&date_after=2026-10-16"
The official record sets behind this page, with data-through dates where measured; missing dates remain unknown.
| Record set | Source | Permits | Data through | Note |
|---|---|---|---|---|
| Permits | EnerGov permit portal | 219,258 | 2026-11-10 |
Related coverage in South Carolina and nationwide.
We ingest Horry County's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.
The newest permit we hold for Horry County, South Carolina is dated November 10, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.
You need a free account, which needs no credit card. With it you can search Horry County permits in the browser or call the API (100 requests per day; the free plan covers the last 30 days of permits).
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) attempt delivery of eligible matching records after ingestion. Source delays, matching windows, backlog, retries and endpoint availability affect arrival.
The median filing-to-issue date gap in the qualifying held Horry County records rounds to 0 days. This includes permits issued in the last 12 months with both dates and nonnegative gaps of at most 365 days. Date fields do not establish the submission method or processing speed, and this aggregate is not a forecast for a new application.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key