Access 37,155 building permits issued in Cleveland, Tennessee through a single REST API, normalized into a consistent schema. Data through October 5, 2026.
Most common permit types issued in the last year.
Drill into the most common permit categories in Cleveland.
Permit activity for individual ZIP codes in Cleveland, newest first by volume.
Every permit we hold for one Cleveland address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.
The 10 most recent permits issued in Cleveland, Tennessee. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-10-05 | MECR-2026-3071 | 1822 GATE TOWER WAY NE | Mechanical | New Construction |
| 2026-10-05 | MECR-2026-3072 | 1824 GATE TOWER WAY NE | Mechanical | New Construction |
| 2026-10-05 | ELER-2026-6560 | 142 HIGH ST NE | Electrical | Addition, Alteration, Remodel, Repair |
| 2026-10-05 | BLDR-2026-3204 | 3609 BOWMAN CIRCLE DR NE | Addition | Addition, Alteration, Remodel, Repair |
| 2026-10-05 | MECR-2026-3074 | 1828 GATE TOWER WAY NE | Mechanical | New Construction |
| 2026-10-05 | MECR-2026-3073 | 1826 GATE TOWER WAY NE | Mechanical | New Construction |
| 2026-10-05 | BLDR-2026-3206 | 1570 LEYLAND PASS NE | New construction | New Construction |
| 2026-10-05 | BLDR-2026-3207 | 1562 LEYLAND PASS NE | New construction | New Construction |
| 2026-10-05 | BLDR-2026-3205 | 1563 LEYLAND PASS NE | New construction | New Construction |
| 2026-10-05 | MECR-2026-3070 | 220 ARTHUR CT NW | Mechanical | New Construction |
Query Cleveland, Tennessee permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search Cleveland permits issued in the last 30 days curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Cleveland&state=TN&issued_after=2026-09-06"
The official record sets behind this page, with the date each one's data runs through.
| Record set | Source | Permits | Data through | Note |
|---|---|---|---|---|
| Permits | EnerGov permit portal | 37,155 | 2026-10-05 |
Related coverage in Tennessee and nationwide.
We ingest Cleveland's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.
The newest permit we hold for Cleveland, Tennessee is dated October 5, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.
Yes — search Cleveland permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.
The median time from permit filing to issuance in Cleveland, Tennessee is 1 day, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key