Access 10,000 building permits issued in Kyle, Texas through a single REST API. Refreshed daily from the official Kyle open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
The 10 most recent permits issued in Kyle, Texas. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-04 | BLR2026-12480 | 534 ELEPHANT ISLAND | Interior remodel | 1700K Left (Carson) - 3 or 4 bedrooms, 2.5 or 3.5 Bathrooms, Gourmet Kitchen, Cov... |
| 2026-06-04 | BLR2026-12488 | 575 ELEPHANT ISLAND | Interior remodel | PLAN CHANGE - Had to change the garage swing to a Left due to a Fire Hydrant preve... |
| 2026-06-04 | BLC2026-1647 | 19200 MARKETPLACE | Interior remodel | Frame and sheetrock new walls for 6 offices in existing office space |
| 2026-06-04 | BLR2026-12479 | 647 ELEPHANT ISLAND | New construction | 1546 Crescendo - New 1-Story Single Family Residence w/ 3 bedrooms, 2 bathrooms, G... |
| 2026-06-04 | BLR2026-12473 | 329 OLD TOWN | Other | R530C/K-50 |
| 2026-06-04 | BLR2026-12614 | 157 MAPLEWOOD | Foundation | Installing 11 exterior piers and adjusting 3 exterior piers |
| 2026-06-04 | BLR2026-12482 | 427 ELEPHANT ISLAND | New construction | 1546 B RightCrescendo - New 1-Story Single Family Residence w/ 3 bedrooms, 2 bathr... |
| 2026-06-03 | IRRS2026-8573 | 19150 MARKETPLACE | Other | Maldonado Nursery and Landscaping, Inc. will furnish all labor, materials, equipme... |
| 2026-06-03 | BLR2026-12468 | 201 YOUNG | New construction | 1980 (Parker) - New 2-Story Single Family Residence w 3 or 4 bedrooms, 2.5 or 3.5 ... |
| 2026-06-03 | BLR2026-12428 | 201 ANNETTE | Other | Kyle, Texas 78640 |
Query Kyle, Texas permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Kyle permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Kyle&state=TX&issued_after=2026-04-01"
Related coverage in Texas and nationwide.
We ingest data directly from the official Kyle open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Kyle, Texas was issued on June 4, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Kyle permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Kyle, Texas is 7 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key