Access 122,778 building permits issued in Port Arthur, Texas through a single REST API. Refreshed daily from the official Port Arthur open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Port Arthur.
Most active contractors by permit volume in Port Arthur.
The 10 most recent permits issued in Port Arthur, Texas. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-06 | 26-01302-BLDR | 832 LEE | Roofing | RED TAGGED PUNCHLIST REPAIRS |
| 2026-08-06 | 26-00355-GAS | 5641 GULFWAY | Other | ANNUAL GAS TEST MAIN BUILDING, CAFETERIA & FIELD HOUSE |
| 2026-08-06 | 26-01304-BLDR | 3600 11TH | Fence | BUILD WOOD FENCE AROUND PROPERTY, 6' TO BACK, 4' TO FRONT |
| 2026-08-06 | 26-00208-BLDC | 5262 GULFWAY | Roofing | SHINGLE ROOF REPLACEMENT |
| 2026-08-06 | 26-00354-GAS | 833 6TH | Other | Pressure gas test |
| 2026-08-06 | 26-01303-BLDR | 4848 ATLANTIC | Interior remodel | BUILD ATTACHED 2 CAR GARAGE (29X24) AND 2 CAR CARPORT (23X24) IN FRONT OF HOME |
| 2026-08-05 | 26-01299-BLDR | 2261 FREDRICH | Roofing | Roof replacement |
| 2026-08-05 | 26-01300-BLDR | 2138 CASHMERE | Roofing | Roof replacement |
| 2026-08-05 | 26-00316-PLMB | 3852 BLACKBERRY | Plumbing | Replace 75 ft of sewer line |
| 2026-08-05 | 26-00761-EL | 1724 8TH | Roofing | RED TAGGED PUNCHLIST REPAIRS |
Query Port Arthur, Texas permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Port Arthur permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Port%20Arthur&state=TX&issued_after=2026-04-01"
Related coverage in Texas and nationwide.
We ingest data directly from the official Port Arthur open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Port Arthur, Texas was issued on August 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Port Arthur permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
Most Port Arthur permits are issued on the same day they are filed, reflecting electronic submission and same-day processing for routine permit types. Larger or more complex projects (new construction, major additions) often take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key